Storage power plant · Maricopa, AZ

Pediment BESS I

Pediment BESS I is a 250 MW storage power plant in Maricopa County, Arizona, operated by Pediment BESS I LLC. Its oldest generator still running came online in 2026.

Capacity250 MWNameplate, September 2026
Net energy–Not reported
Capacity factor–Not a full year of data
Generators1Oldest from 2026

Pediment BESS I in context

Among the 41 storage plants in Arizona in the EIA's inventory, it is the 9th largest, about 4.0% of the state's 6.3 GW of storage capacity.

Maricopa County has 82 power plants of 1 MW or more with 24 GW in all; Pediment BESS I is 1% of that and the 6th largest of 21 storage plants there.

The average electricity customer in Maricopa County goes 1.5 hours a year without power, the 7th most of 11 counties in Arizona. The county's page has the full outage record.

Where it is

Pediment BESS I (outlined) and other plants in Maricopa County, shaded. 33.356, -111.602.

Plant facts

Operator
Pediment BESS I LLC
Sector
IPP Non-CHP
Grid operator
SRP
County
Maricopa County, AZ
EIA plant ID
68477
Where Arizona's power comes from → Arizona power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
1 Batteries 250 MW · 1,000 MWh 2026 –

Questions

Pediment BESS I, answered

How much can Pediment BESS I store and deliver?

Pediment BESS I can deliver up to 250 MW and hold 1,000 MWh of energy, from one battery or storage system.

Where is Pediment BESS I?

Pediment BESS I is in Maricopa County, Arizona, at about 33.356°, -111.602°. It is one of 82 power plants of 1 MW or more in the county. The average electricity customer in Maricopa County goes 1.5 hours a year without power, the 7th most of 11 counties in Arizona. The county's page has the full outage record.

Who operates Pediment BESS I?

It is operated by Pediment BESS I LLC (EIA sector: IPP Non-CHP), and it feeds Salt River Project.

When did Pediment BESS I open?

Its oldest generator still running came online in 2026.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2025–2025). Methodology.