Wind power plant · Matagorda, TX
Peyton Creek Wind Farm II
Peyton Creek Wind Farm II is a 243 MW wind power plant in Matagorda County, Texas, operated by RWE Americas, LLC. Its oldest generator still running came online in 2025. In 2025 it generated 464 GWh, about what 35,000 average Texas homes use in a year.
Peyton Creek Wind Farm II in context
Among the 230 wind plants in Texas in the EIA's inventory, it is the 54th largest, about 0.5% of the state's 45 GW of wind capacity.
Matagorda County has 7 power plants of 1 MW or more with 3.1 GW in all; Peyton Creek Wind Farm II is 8% of that and the largest of 2 wind plants there.
The average electricity customer in Matagorda County goes 25 hours a year without power, the 24th most of 240 counties in Texas. The county's page has the full outage record.
Seasons
Month by month, 2025
Where it is
Peyton Creek Wind Farm II (outlined) and other plants in Matagorda County, shaded. 28.897, -95.865.
Plant facts
- Operator
- RWE Americas, LLC
- Sector
- IPP Non-CHP
- Grid operator
- ERCO
- County
- Matagorda County, TX
- EIA plant ID
- 67700
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| WT2 | Onshore Wind Turbine | 243 MW | 2025 | – |
Nearby
Other plants in Matagorda County
Questions
Peyton Creek Wind Farm II, answered
How much power does Peyton Creek Wind Farm II produce?
Peyton Creek Wind Farm II has 243 MW of capacity from one generator. In 2025 it generated 464 GWh.
How many homes does Peyton Creek Wind Farm II power?
Its 2025 output of 464 GWh equals the yearly electricity use of about 35,000 average Texas homes (1,110 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Peyton Creek Wind Farm II?
Peyton Creek Wind Farm II is in Matagorda County, Texas, at about 28.897°, -95.865°. It is one of 7 power plants of 1 MW or more in the county. The average electricity customer in Matagorda County goes 25 hours a year without power, the 24th most of 240 counties in Texas. The county's page has the full outage record.
Who operates Peyton Creek Wind Farm II?
It is operated by RWE Americas, LLC (EIA sector: IPP Non-CHP), and it feeds ERCOT, the Texas grid.
When did Peyton Creek Wind Farm II open?
Its oldest generator still running came online in 2025.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2025–2025). Homes equivalent uses the average Texas home's 1,110 kWh a month in 2025. Methodology.