Nuclear power plant · Matagorda, TX
South Texas Project
South Texas Project is a 2.7 GW nuclear power plant in Matagorda County, Texas, operated by STP Nuclear Operating Co. Its oldest generator still running came online in 1988. In 2025 it generated 22 TWh, about what 1,635,000 average Texas homes use in a year.
South Texas Project in context
Among the 2 nuclear plants in Texas in the EIA's inventory, it is the largest, about 53% of the state's 5.1 GW of nuclear capacity.
Matagorda County has 7 power plants of 1 MW or more with 3.1 GW in all; South Texas Project is 86% of that.
Its capacity factor of 92% in 2025 is close to the 89% typical for nuclear plants across the US.
The average electricity customer in Matagorda County goes 25 hours a year without power, the 24th most of 240 counties in Texas. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
South Texas Project (outlined) and other plants in Matagorda County, shaded. 28.795, -96.048.
Plant facts
- Operator
- STP Nuclear Operating Co
- Sector
- IPP Non-CHP
- Grid operator
- ERCO
- County
- Matagorda County, TX
- EIA plant ID
- 6251
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| 1 | Nuclear | 1.4 GW | 1988 | – |
| 2 | Nuclear | 1.4 GW | 1989 | – |
Nearby
Other plants in Matagorda County
Questions
South Texas Project, answered
How much power does South Texas Project produce?
South Texas Project has 2.7 GW of capacity from 2 generators. In 2025 it generated 22 TWh, 92% of the most it could have made running flat out all year (its capacity factor).
How many homes does South Texas Project power?
Its 2025 output of 22 TWh equals the yearly electricity use of about 1,635,000 average Texas homes (1,110 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is South Texas Project?
South Texas Project is in Matagorda County, Texas, at about 28.795°, -96.048°. It is one of 7 power plants of 1 MW or more in the county. The average electricity customer in Matagorda County goes 25 hours a year without power, the 24th most of 240 counties in Texas. The county's page has the full outage record.
Who operates South Texas Project?
It is operated by STP Nuclear Operating Co (EIA sector: IPP Non-CHP), and it feeds ERCOT, the Texas grid.
When did South Texas Project open?
Its oldest generator still running came online in 1988.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Texas home's 1,110 kWh a month in 2025. Methodology.