Natural gas power plant · Freestone, TX

Pin Oak Creek Energy Center, LLC

Pin Oak Creek Energy Center, LLC is a 444 MW natural gas power plant in Freestone County, Texas, operated by Freestone Power Generation LLC. Its oldest generator still running came online in 2026.

Capacity444 MWNameplate, September 2026
Generated–Not reported
Capacity factor–Not a full year of data
Generators2Oldest from 2026

Pin Oak Creek Energy Center, LLC in context

Among the 309 natural gas plants in Texas in the EIA's inventory, it is the 84th largest, about 0.5% of the state's 83 GW of natural gas capacity.

Freestone County has 3 power plants of 1 MW or more with 1.5 GW in all; Pin Oak Creek Energy Center, LLC is 30% of that and the 2nd largest of 2 natural gas plants there.

The average electricity customer in Freestone County goes 23 hours a year without power, the 32nd most of 240 counties in Texas. The county's page has the full outage record.

Where it is

Pin Oak Creek Energy Center, LLC (outlined) and other plants in Freestone County, shaded. 31.894, -96.111.

Plant facts

Operator
Freestone Power Generation LLC
Sector
IPP Non-CHP
Grid operator
ERCO
County
Freestone County, TX
EIA plant ID
67500
Where Texas's power comes from → Texas power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
GT5 Natural Gas Fired Combustion Turbine 222 MW 2026 –
GT6 Natural Gas Fired Combustion Turbine 222 MW 2026 –

Questions

Pin Oak Creek Energy Center, LLC, answered

How much power does Pin Oak Creek Energy Center, LLC produce?

Pin Oak Creek Energy Center, LLC has 444 MW of capacity from 2 generators. No full year of generation is reported yet.

Where is Pin Oak Creek Energy Center, LLC?

Pin Oak Creek Energy Center, LLC is in Freestone County, Texas, at about 31.894°, -96.111°. It is one of 3 power plants of 1 MW or more in the county. The average electricity customer in Freestone County goes 23 hours a year without power, the 32nd most of 240 counties in Texas. The county's page has the full outage record.

Who operates Pin Oak Creek Energy Center, LLC?

It is operated by Freestone Power Generation LLC (EIA sector: IPP Non-CHP), and it feeds ERCOT, the Texas grid.

When did Pin Oak Creek Energy Center, LLC open?

Its oldest generator still running came online in 2026.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2025–2025). Methodology.