Solar power plant · Pinal, AZ

Pinal Central Energy Center Hybrid

Pinal Central Energy Center Hybrid is a 30 MW solar power plant in Pinal County, Arizona, operated by Pinal Central Energy Center, LLC. Its oldest generator still running came online in 2018. In 2025 it generated 56 GWh, about what 4,500 average Arizona homes use in a year.

Capacity30 MWNameplate, September 2026
Generated56 GWhIn 2025
Capacity factor21%Share of the most it could make, 2025
Generators2Oldest from 2018

Pinal Central Energy Center Hybrid in context

Among the 109 solar plants in Arizona in the EIA's inventory, it is the 48th largest, about 0.3% of the state's 9.9 GW of solar capacity.

Pinal County has 22 power plants of 1 MW or more with 4.9 GW in all; Pinal Central Energy Center Hybrid is 1% of that and the 11th largest of 14 solar plants there.

Its capacity factor of 21% in 2025 is close to the 20% typical for solar plants across the US.

The average electricity customer in Pinal County goes 1.8 hours a year without power, the 5th most of 11 counties in Arizona. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

02040608020182019202020212022202320242025GWh 56
020406080201920212023202556

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

Pinal Central Energy Center Hybrid (outlined) and other plants in Pinal County, shaded. 32.876, -111.551.

Plant facts

Operator
Pinal Central Energy Center, LLC
Sector
IPP Non-CHP
Grid operator
SRP
County
Pinal County, AZ
EIA plant ID
61678
  • Solar20 MW67%
  • Storage10 MW33%
Where Arizona's power comes from → Arizona power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
PCEC Solar Photovoltaic 20 MW 2018 –
BA1 Batteries 10 MW · 40 MWh 2018 –

Questions

Pinal Central Energy Center Hybrid, answered

How much power does Pinal Central Energy Center Hybrid produce?

Pinal Central Energy Center Hybrid has 30 MW of capacity from 2 generators. In 2025 it generated 56 GWh, 21% of the most it could have made running flat out all year (its capacity factor).

How many homes does Pinal Central Energy Center Hybrid power?

Its 2025 output of 56 GWh equals the yearly electricity use of about 4,500 average Arizona homes (1,030 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is Pinal Central Energy Center Hybrid?

Pinal Central Energy Center Hybrid is in Pinal County, Arizona, at about 32.876°, -111.551°. It is one of 22 power plants of 1 MW or more in the county. The average electricity customer in Pinal County goes 1.8 hours a year without power, the 5th most of 11 counties in Arizona. The county's page has the full outage record.

Who operates Pinal Central Energy Center Hybrid?

It is operated by Pinal Central Energy Center, LLC (EIA sector: IPP Non-CHP), and it feeds Salt River Project.

When did Pinal Central Energy Center Hybrid open?

Its oldest generator still running came online in 2018.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Arizona home's 1,030 kWh a month in 2025. Methodology.