Solar power plant · Hopkins, TX
Pine Forest Solar I
Pine Forest Solar I is a 500 MW solar power plant in Hopkins County, Texas, operated by Pine Forest Solar I, LLC. Its oldest generator still running came online in 2025. In 2025 it generated 30 GWh, about what 2,200 average Texas homes use in a year.
Pine Forest Solar I in context
Among the 250 solar plants in Texas in the EIA's inventory, it is the 7th largest, about 1.3% of the state's 37 GW of solar capacity.
Hopkins County has 5 power plants of 1 MW or more with 1.8 GW in all; Pine Forest Solar I is 28% of that and the largest of 4 solar plants there.
The average electricity customer in Hopkins County goes 9.8 hours a year without power, the 117th most of 240 counties in Texas. The county's page has the full outage record.
Seasons
Month by month, 2025
Where it is
Pine Forest Solar I (outlined) and other plants in Hopkins County, shaded. 33.101, -95.392.
Plant facts
- Operator
- Pine Forest Solar I, LLC
- Sector
- IPP Non-CHP
- Grid operator
- DOPD
- County
- Hopkins County, TX
- EIA plant ID
- 68906
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| PFPV | Solar Photovoltaic | 300 MW | 2025 | – |
| PFBA | Batteries | 200 MW · 200 MWh | 2025 | – |
Planned
| Generator | Technology | Capacity | Expected |
|---|---|---|---|
| PFBA2 | Batteries | 200 MW | 2027 |
Nearby
Other plants in Hopkins County
Questions
Pine Forest Solar I, answered
How much power does Pine Forest Solar I produce?
Pine Forest Solar I has 500 MW of capacity from 2 generators. In 2025 it generated 30 GWh.
How many homes does Pine Forest Solar I power?
Its 2025 output of 30 GWh equals the yearly electricity use of about 2,200 average Texas homes (1,110 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Pine Forest Solar I?
Pine Forest Solar I is in Hopkins County, Texas, at about 33.101°, -95.392°. It is one of 5 power plants of 1 MW or more in the county. The average electricity customer in Hopkins County goes 9.8 hours a year without power, the 117th most of 240 counties in Texas. The county's page has the full outage record.
Who operates Pine Forest Solar I?
It is operated by Pine Forest Solar I, LLC (EIA sector: IPP Non-CHP), and it feeds balancing authority DOPD.
When did Pine Forest Solar I open?
Its oldest generator still running came online in 2025. 1 more generator is planned.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2025–2025). Homes equivalent uses the average Texas home's 1,110 kWh a month in 2025. Methodology.