Stampede Solar Hybrid is a 328 MW solar power plant in Hopkins County, Texas, operated by Stampede Solar Project LLC. Its oldest generator still running came online in 2024. In 2025 it generated 541 GWh, about what 41,000 average Texas homes use in a year.
Stampede Solar Hybrid in context
Among the 250 solar plants in Texas in the EIA's inventory, it is the 25th largest, about 0.9% of the state's 37 GW of solar capacity.
Hopkins County has 5 power plants of 1 MW or more with 1.8 GW in all; Stampede Solar Hybrid is 18% of that and the 3rd largest of 4 solar plants there.
The average electricity customer in Hopkins County goes 9.8 hours a year without power, the 117th most of 240 counties in Texas. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Stampede Solar Hybrid (outlined) and other plants in Hopkins County, shaded. 33.201, -95.319.
Plant facts
- Operator
- Stampede Solar Project LLC
- Sector
- IPP Non-CHP
- Grid operator
- ERCO
- County
- Hopkins County, TX
- EIA plant ID
- 67762
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| STMPS | Solar Photovoltaic | 256 MW | 2025 | – |
| STMPB | Batteries | 72 MW · 115 MWh | 2024 | – |
Nearby
Other plants in Hopkins County
Questions
Stampede Solar Hybrid, answered
How much power does Stampede Solar Hybrid produce?
Stampede Solar Hybrid has 328 MW of capacity from 2 generators. In 2025 it generated 541 GWh.
How many homes does Stampede Solar Hybrid power?
Its 2025 output of 541 GWh equals the yearly electricity use of about 41,000 average Texas homes (1,110 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Stampede Solar Hybrid?
Stampede Solar Hybrid is in Hopkins County, Texas, at about 33.201°, -95.319°. It is one of 5 power plants of 1 MW or more in the county. The average electricity customer in Hopkins County goes 9.8 hours a year without power, the 117th most of 240 counties in Texas. The county's page has the full outage record.
Who operates Stampede Solar Hybrid?
It is operated by Stampede Solar Project LLC (EIA sector: IPP Non-CHP), and it feeds ERCOT, the Texas grid.
When did Stampede Solar Hybrid open?
Its oldest generator still running came online in 2024.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2024–2025). Homes equivalent uses the average Texas home's 1,110 kWh a month in 2025. Methodology.