Solar power plant · Hill, TX

Pitts Dudik Solar II

Pitts Dudik Solar II is a 30 MW solar power plant in Hill County, Texas, operated by Elawan Pitts Dudik Solar II, LLC. Its oldest generator still running came online in 2026.

Capacity30 MWNameplate, September 2026
Generated–Not reported
Capacity factor–Not a full year of data
Generators1Oldest from 2026

Pitts Dudik Solar II in context

Among the 250 solar plants in Texas in the EIA's inventory, it is the 170th largest, about 0.1% of the state's 37 GW of solar capacity.

Hill County has 10 power plants of 1 MW or more with 1.7 GW in all; Pitts Dudik Solar II is 2% of that and the 8th largest of 8 solar plants there.

The average electricity customer in Hill County goes 8.5 hours a year without power, the 134th most of 240 counties in Texas. The county's page has the full outage record.

Where it is

Pitts Dudik Solar II (outlined) and other plants in Hill County, shaded. 31.892, -96.879.

Plant facts

Operator
Elawan Pitts Dudik Solar II, LLC
Sector
IPP Non-CHP
Grid operator
ERCO
County
Hill County, TX
EIA plant ID
69674
Where Texas's power comes from → Texas power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
PDII Solar Photovoltaic 30 MW 2026 –

Questions

Pitts Dudik Solar II, answered

How much power does Pitts Dudik Solar II produce?

Pitts Dudik Solar II has 30 MW of capacity from one generator. No full year of generation is reported yet.

Where is Pitts Dudik Solar II?

Pitts Dudik Solar II is in Hill County, Texas, at about 31.892°, -96.879°. It is one of 10 power plants of 1 MW or more in the county. The average electricity customer in Hill County goes 8.5 hours a year without power, the 134th most of 240 counties in Texas. The county's page has the full outage record.

Who operates Pitts Dudik Solar II?

It is operated by Elawan Pitts Dudik Solar II, LLC (EIA sector: IPP Non-CHP), and it feeds ERCOT, the Texas grid.

When did Pitts Dudik Solar II open?

Its oldest generator still running came online in 2026.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2025–2025). Methodology.