Solar power plant · Hernando, FL
Rattler Solar Plant
Rattler Solar Plant is a 75 MW solar power plant in Hernando County, Florida, operated by Duke Energy Florida, LLC. Its oldest generator still running came online in 2025. In 2025 it generated 23 GWh, about what 1,700 average Florida homes use in a year.
Rattler Solar Plant in context
Among the 226 solar plants in Florida in the EIA's inventory, it is the 37th largest, about 0.5% of the state's 14 GW of solar capacity.
The average electricity customer in Hernando County goes 5.3 hours a year without power, the 47th most of 67 counties in Florida. The county's page has the full outage record.
Seasons
Month by month, 2025
Where it is
Rattler Solar Plant (outlined) and other plants in Hernando County, shaded. 28.634, -82.289.
Plant facts
- Operator
- Duke Energy Florida, LLC
- Sector
- Electric Utility
- Grid operator
- FPC
- County
- Hernando County, FL
- EIA plant ID
- 69354
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| RTLR1 | Solar Photovoltaic | 75 MW | 2025 | – |
Questions
Rattler Solar Plant, answered
How much power does Rattler Solar Plant produce?
Rattler Solar Plant has 75 MW of capacity from one generator. In 2025 it generated 23 GWh.
How many homes does Rattler Solar Plant power?
Its 2025 output of 23 GWh equals the yearly electricity use of about 1,700 average Florida homes (1,103 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Rattler Solar Plant?
Rattler Solar Plant is in Hernando County, Florida, at about 28.634°, -82.289°. The average electricity customer in Hernando County goes 5.3 hours a year without power, the 47th most of 67 counties in Florida. The county's page has the full outage record.
Who operates Rattler Solar Plant?
It is operated by Duke Energy Florida, LLC (EIA sector: Electric Utility), and it feeds balancing authority FPC.
When did Rattler Solar Plant open?
Its oldest generator still running came online in 2025.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2025–2025). Homes equivalent uses the average Florida home's 1,103 kWh a month in 2025. Methodology.