Solar power plant · Cochise, AZ
Red Horse 2
Red Horse 2 is a 81 MW solar power plant in Cochise County, Arizona, operated by Red Horse 2. Its oldest generator still running came online in 2015. In 2025 it generated 144 GWh, about what 12,000 average Arizona homes use in a year.
Red Horse 2 in context
Among the 109 solar plants in Arizona in the EIA's inventory, it is the 36th largest, about 0.8% of the state's 9.9 GW of solar capacity.
Cochise County has 10 power plants of 1 MW or more with 1.7 GW in all; Red Horse 2 is 5% of that and the 2nd largest of 5 solar plants there.
Its capacity factor of 20% in 2025 is close to the 20% typical for solar plants across the US.
The average electricity customer in Cochise County goes 0.6 hours a year without power, the 11th most of 11 counties in Arizona. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Red Horse 2 (outlined) and other plants in Cochise County, shaded. 32.286, -110.088.
Plant facts
- Operator
- Red Horse 2
- Sector
- IPP Non-CHP
- Grid operator
- TEPC
- County
- Cochise County, AZ
- EIA plant ID
- 58833
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| RH2S | Solar Photovoltaic | 51 MW | 2015 | – |
| RH2W | Onshore Wind Turbine | 30 MW | 2015 | – |
Questions
Red Horse 2, answered
How much power does Red Horse 2 produce?
Red Horse 2 has 81 MW of capacity from 2 generators. In 2025 it generated 144 GWh, 20% of the most it could have made running flat out all year (its capacity factor).
How many homes does Red Horse 2 power?
Its 2025 output of 144 GWh equals the yearly electricity use of about 12,000 average Arizona homes (1,030 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Red Horse 2?
Red Horse 2 is in Cochise County, Arizona, at about 32.286°, -110.088°. It is one of 10 power plants of 1 MW or more in the county. The average electricity customer in Cochise County goes 0.6 hours a year without power, the 11th most of 11 counties in Arizona. The county's page has the full outage record.
Who operates Red Horse 2?
It is operated by Red Horse 2 (EIA sector: IPP Non-CHP), and it feeds balancing authority TEPC.
When did Red Horse 2 open?
Its oldest generator still running came online in 2015.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Arizona home's 1,030 kWh a month in 2025. Methodology.