Solar power plant · Miami-Dade, FL
Redlands
Redlands is a 75 MW solar power plant in Miami-Dade County, Florida, operated by Florida Power & Light Co. Its oldest generator still running came online in 2025. In 2025 it generated 163 GWh, about what 12,000 average Florida homes use in a year.
Redlands in context
Among the 226 solar plants in Florida in the EIA's inventory, it is the 133rd largest, about 0.5% of the state's 14 GW of solar capacity.
Miami-Dade County has 10 power plants of 1 MW or more with 3.3 GW in all; Redlands is 2% of that and the 3rd largest of 5 solar plants there.
The average electricity customer in Miami-Dade County goes 3.2 hours a year without power, the 58th most of 67 counties in Florida. The county's page has the full outage record.
Seasons
Month by month, 2025
Where it is
Redlands (outlined) and other plants in Miami-Dade County, shaded. 25.543, -80.547.
Plant facts
- Operator
- Florida Power & Light Co
- Sector
- Electric Utility
- Grid operator
- FPL
- County
- Miami-Dade County, FL
- EIA plant ID
- 65914
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| 1 | Solar Photovoltaic | 75 MW | 2025 | – |
Nearby
Other plants in Miami-Dade County
Questions
Redlands, answered
How much power does Redlands produce?
Redlands has 75 MW of capacity from one generator. In 2025 it generated 163 GWh.
How many homes does Redlands power?
Its 2025 output of 163 GWh equals the yearly electricity use of about 12,000 average Florida homes (1,103 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Redlands?
Redlands is in Miami-Dade County, Florida, at about 25.543°, -80.547°. It is one of 10 power plants of 1 MW or more in the county. The average electricity customer in Miami-Dade County goes 3.2 hours a year without power, the 58th most of 67 counties in Florida. The county's page has the full outage record.
Who operates Redlands?
It is operated by Florida Power & Light Co (EIA sector: Electric Utility), and it feeds Florida Power & Light.
When did Redlands open?
Its oldest generator still running came online in 2025.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2025–2025). Homes equivalent uses the average Florida home's 1,103 kWh a month in 2025. Methodology.