Storage power plant · Pima, AZ

Roadrunner Reserve Phase 2

Roadrunner Reserve Phase 2 is a 200 MW storage power plant in Pima County, Arizona, operated by Tucson Electric Power Co. Its oldest generator still running came online in 2026.

Capacity200 MWNameplate, September 2026
Net energy–Not reported
Capacity factor–Not a full year of data
Generators1Oldest from 2026

Roadrunner Reserve Phase 2 in context

Among the 41 storage plants in Arizona in the EIA's inventory, it is the 13th largest, about 3.2% of the state's 6.3 GW of storage capacity.

Pima County has 38 power plants of 1 MW or more with 2.1 GW in all; Roadrunner Reserve Phase 2 is 10% of that and the 3rd largest of 6 storage plants there.

The average electricity customer in Pima County goes 1.4 hours a year without power, the 9th most of 11 counties in Arizona. The county's page has the full outage record.

Where it is

Roadrunner Reserve Phase 2 (outlined) and other plants in Pima County, shaded. 32.073, -110.821.

Plant facts

Operator
Tucson Electric Power Co
Sector
Electric Utility
Grid operator
TEPC
County
Pima County, AZ
EIA plant ID
68937
Where Arizona's power comes from → Arizona power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
RDR2 Batteries 200 MW · 800 MWh 2026 –

Questions

Roadrunner Reserve Phase 2, answered

How much can Roadrunner Reserve Phase 2 store and deliver?

Roadrunner Reserve Phase 2 can deliver up to 200 MW and hold 800 MWh of energy, from one battery or storage system.

Where is Roadrunner Reserve Phase 2?

Roadrunner Reserve Phase 2 is in Pima County, Arizona, at about 32.073°, -110.821°. It is one of 38 power plants of 1 MW or more in the county. The average electricity customer in Pima County goes 1.4 hours a year without power, the 9th most of 11 counties in Arizona. The county's page has the full outage record.

Who operates Roadrunner Reserve Phase 2?

It is operated by Tucson Electric Power Co (EIA sector: Electric Utility), and it feeds balancing authority TEPC.

When did Roadrunner Reserve Phase 2 open?

Its oldest generator still running came online in 2026.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2025–2025). Methodology.