Storage power plant · Pima, AZ
Wilmot Energy Center II
Wilmot Energy Center II is a 200 MW storage power plant in Pima County, Arizona, operated by Wilmot Energy Center II, LLC. Its oldest generator still running came online in 2026.
Wilmot Energy Center II in context
Among the 41 storage plants in Arizona in the EIA's inventory, it is the 14th largest, about 3.2% of the state's 6.3 GW of storage capacity.
Pima County has 38 power plants of 1 MW or more with 2.1 GW in all; Wilmot Energy Center II is 10% of that and the 4th largest of 6 storage plants there.
The average electricity customer in Pima County goes 1.4 hours a year without power, the 9th most of 11 counties in Arizona. The county's page has the full outage record.
Where it is
Wilmot Energy Center II (outlined) and other plants in Pima County, shaded. 31.592, -110.501.
Plant facts
- Operator
- Wilmot Energy Center II, LLC
- Sector
- IPP Non-CHP
- Grid operator
- TEPC
- County
- Pima County, AZ
- EIA plant ID
- 69254
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| WIL2B | Batteries | 100 MW · 100 MWh | 2026 | – |
| WIL2S | Solar Photovoltaic | 100 MW | 2026 | – |
Questions
Wilmot Energy Center II, answered
How much can Wilmot Energy Center II store and deliver?
Wilmot Energy Center II can deliver up to 200 MW and hold 100 MWh of energy, from 2 storage units.
Where is Wilmot Energy Center II?
Wilmot Energy Center II is in Pima County, Arizona, at about 31.592°, -110.501°. It is one of 38 power plants of 1 MW or more in the county. The average electricity customer in Pima County goes 1.4 hours a year without power, the 9th most of 11 counties in Arizona. The county's page has the full outage record.
Who operates Wilmot Energy Center II?
It is operated by Wilmot Energy Center II, LLC (EIA sector: IPP Non-CHP), and it feeds balancing authority TEPC.
When did Wilmot Energy Center II open?
Its oldest generator still running came online in 2026.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2025–2025). Methodology.