Solar power plant · Pueblo, CO
Rocky Mountain Solar
Rocky Mountain Solar is a 525 MW solar power plant in Pueblo County, Colorado, operated by Public Service Co of Colorado. Its oldest generator still running came online in 2025. In 2025 it generated 3.1 GWh, about what 393 average Colorado homes use in a year.
Rocky Mountain Solar in context
Among the 185 solar plants in Colorado in the EIA's inventory, it is the largest, about 14% of the state's 3.8 GW of solar capacity.
Pueblo County has 16 power plants of 1 MW or more with 3.6 GW in all; Rocky Mountain Solar is 15% of that and the largest of 11 solar plants there.
The average electricity customer in Pueblo County goes 2.4 hours a year without power, the 26th most of 39 counties in Colorado. The county's page has the full outage record.
Seasons
Month by month, 2025
Where it is
Rocky Mountain Solar (outlined) and other plants in Pueblo County, shaded. 38.153, -104.576.
Plant facts
- Operator
- Public Service Co of Colorado
- Sector
- Electric Utility
- Grid operator
- PSCO
- County
- Pueblo County, CO
- EIA plant ID
- 69100
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| RKMS | Solar Photovoltaic | 325 MW | 2025 | – |
| RKMB | Batteries | 200 MW · 800 MWh | 2026 | – |
Questions
Rocky Mountain Solar, answered
How much power does Rocky Mountain Solar produce?
Rocky Mountain Solar has 525 MW of capacity from 2 generators. In 2025 it generated 3.1 GWh.
How many homes does Rocky Mountain Solar power?
Its 2025 output of 3.1 GWh equals the yearly electricity use of about 393 average Colorado homes (658 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Rocky Mountain Solar?
Rocky Mountain Solar is in Pueblo County, Colorado, at about 38.153°, -104.576°. It is one of 16 power plants of 1 MW or more in the county. The average electricity customer in Pueblo County goes 2.4 hours a year without power, the 26th most of 39 counties in Colorado. The county's page has the full outage record.
Who operates Rocky Mountain Solar?
It is operated by Public Service Co of Colorado (EIA sector: Electric Utility), and it feeds Public Service Company of Colorado.
When did Rocky Mountain Solar open?
Its oldest generator still running came online in 2025.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2025–2025). Homes equivalent uses the average Colorado home's 658 kWh a month in 2025. Methodology.