Solar power plant · Pueblo, CO

Rocky Mountain Solar

Rocky Mountain Solar is a 525 MW solar power plant in Pueblo County, Colorado, operated by Public Service Co of Colorado. Its oldest generator still running came online in 2025. In 2025 it generated 3.1 GWh, about what 393 average Colorado homes use in a year.

Capacity525 MWNameplate, September 2026
Generated3.1 GWhIn 2025
Capacity factor–Not a full year of data
Generators2Oldest from 2025

Rocky Mountain Solar in context

Among the 185 solar plants in Colorado in the EIA's inventory, it is the largest, about 14% of the state's 3.8 GW of solar capacity.

Pueblo County has 16 power plants of 1 MW or more with 3.6 GW in all; Rocky Mountain Solar is 15% of that and the largest of 11 solar plants there.

The average electricity customer in Pueblo County goes 2.4 hours a year without power, the 26th most of 39 counties in Colorado. The county's page has the full outage record.

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

Rocky Mountain Solar (outlined) and other plants in Pueblo County, shaded. 38.153, -104.576.

Plant facts

Operator
Public Service Co of Colorado
Sector
Electric Utility
Grid operator
PSCO
County
Pueblo County, CO
EIA plant ID
69100
  • Solar325 MW62%
  • Storage200 MW38%
Where Colorado's power comes from → Colorado power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
RKMS Solar Photovoltaic 325 MW 2025 –
RKMB Batteries 200 MW · 800 MWh 2026 –

Questions

Rocky Mountain Solar, answered

How much power does Rocky Mountain Solar produce?

Rocky Mountain Solar has 525 MW of capacity from 2 generators. In 2025 it generated 3.1 GWh.

How many homes does Rocky Mountain Solar power?

Its 2025 output of 3.1 GWh equals the yearly electricity use of about 393 average Colorado homes (658 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is Rocky Mountain Solar?

Rocky Mountain Solar is in Pueblo County, Colorado, at about 38.153°, -104.576°. It is one of 16 power plants of 1 MW or more in the county. The average electricity customer in Pueblo County goes 2.4 hours a year without power, the 26th most of 39 counties in Colorado. The county's page has the full outage record.

Who operates Rocky Mountain Solar?

It is operated by Public Service Co of Colorado (EIA sector: Electric Utility), and it feeds Public Service Company of Colorado.

When did Rocky Mountain Solar open?

Its oldest generator still running came online in 2025.