Solar power plant · Pueblo, CO
Thunder Wolf Energy Center Hybrid
Thunder Wolf Energy Center Hybrid is a 348 MW solar power plant in Pueblo County, Colorado, operated by Thunder Wolf Energy Center, LLC. Its oldest generator still running came online in 2023. In 2025 it generated 544 GWh, about what 69,000 average Colorado homes use in a year.
Thunder Wolf Energy Center Hybrid in context
Among the 185 solar plants in Colorado in the EIA's inventory, it is the 3rd largest, about 9.2% of the state's 3.8 GW of solar capacity.
Pueblo County has 16 power plants of 1 MW or more with 3.6 GW in all; Thunder Wolf Energy Center Hybrid is 10% of that and the 3rd largest of 11 solar plants there.
Its capacity factor of 18% in 2025 is close to the 20% typical for solar plants across the US.
The average electricity customer in Pueblo County goes 2.4 hours a year without power, the 26th most of 39 counties in Colorado. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Thunder Wolf Energy Center Hybrid (outlined) and other plants in Pueblo County, shaded. 38.190, -104.398.
Plant facts
- Operator
- Thunder Wolf Energy Center, LLC
- Sector
- IPP Non-CHP
- Grid operator
- PSCO
- County
- Pueblo County, CO
- EIA plant ID
- 63776
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| TW300 | Solar Photovoltaic | 248 MW | 2023 | – |
| TW100 | Batteries | 100 MW · 400 MWh | 2023 | – |
Questions
Thunder Wolf Energy Center Hybrid, answered
How much power does Thunder Wolf Energy Center Hybrid produce?
Thunder Wolf Energy Center Hybrid has 348 MW of capacity from 2 generators. In 2025 it generated 544 GWh, 18% of the most it could have made running flat out all year (its capacity factor).
How many homes does Thunder Wolf Energy Center Hybrid power?
Its 2025 output of 544 GWh equals the yearly electricity use of about 69,000 average Colorado homes (658 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Thunder Wolf Energy Center Hybrid?
Thunder Wolf Energy Center Hybrid is in Pueblo County, Colorado, at about 38.190°, -104.398°. It is one of 16 power plants of 1 MW or more in the county. The average electricity customer in Pueblo County goes 2.4 hours a year without power, the 26th most of 39 counties in Colorado. The county's page has the full outage record.
Who operates Thunder Wolf Energy Center Hybrid?
It is operated by Thunder Wolf Energy Center, LLC (EIA sector: IPP Non-CHP), and it feeds Public Service Company of Colorado.
When did Thunder Wolf Energy Center Hybrid open?
Its oldest generator still running came online in 2023.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2023–2025). Homes equivalent uses the average Colorado home's 658 kWh a month in 2025. Methodology.