Wind power plant · Hand, SD
Rolling Thunder Wind Farm Hybrid
Rolling Thunder Wind Farm Hybrid is a 26 MW wind power plant in Hand County, South Dakota, operated by Clearlight Energy Holdings LP. Its oldest generator still running came online in 2009. In 2025 it generated 84 GWh, about what 7,100 average South Dakota homes use in a year.
Rolling Thunder Wind Farm Hybrid in context
Among the 25 wind plants in South Dakota in the EIA's inventory, it is the 22nd largest, about 0.7% of the state's 3.5 GW of wind capacity.
Hand County has 2 power plants of 1 MW or more with 226 MW in all; Rolling Thunder Wind Farm Hybrid is 11% of that and the 2nd largest of 2 wind plants there.
Its capacity factor of 37% in 2025 is higher than the 32% typical for wind plants across the US.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Rolling Thunder Wind Farm Hybrid (outlined) and other plants in Hand County, shaded. 44.478, -99.134.
Plant facts
- Operator
- Clearlight Energy Holdings LP
- Sector
- IPP Non-CHP
- Grid operator
- SWPP
- County
- Hand County, SD
- EIA plant ID
- 57045
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| 1 | Onshore Wind Turbine | 25 MW | 2009 | – |
| 2 | Batteries | 0.8 MW · 1 MWh | 2018 | – |
Nearby
Other plants in Hand County
Questions
Rolling Thunder Wind Farm Hybrid, answered
How much power does Rolling Thunder Wind Farm Hybrid produce?
Rolling Thunder Wind Farm Hybrid has 26 MW of capacity from 2 generators. In 2025 it generated 84 GWh, 37% of the most it could have made running flat out all year (its capacity factor).
How many homes does Rolling Thunder Wind Farm Hybrid power?
Its 2025 output of 84 GWh equals the yearly electricity use of about 7,100 average South Dakota homes (984 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Rolling Thunder Wind Farm Hybrid?
Rolling Thunder Wind Farm Hybrid is in Hand County, South Dakota, at about 44.478°, -99.134°. It is one of 2 power plants of 1 MW or more in the county.
Who operates Rolling Thunder Wind Farm Hybrid?
It is operated by Clearlight Energy Holdings LP (EIA sector: IPP Non-CHP), and it feeds the Southwest Power Pool.
When did Rolling Thunder Wind Farm Hybrid open?
Its oldest generator still running came online in 2009.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average South Dakota home's 984 kWh a month in 2025. Methodology.