Wind power plant · Hand, SD

Sweetland Wind Farm, LLC

Sweetland Wind Farm, LLC is a 200 MW wind power plant in Hand County, South Dakota, operated by Sweetland Wind Farm, LLC. Its oldest generator still running came online in 2023. In 2025 it generated 765 GWh, about what 65,000 average South Dakota homes use in a year.

Capacity200 MWNameplate, September 2026
Generated765 GWhIn 2025
Capacity factor44%Share of the most it could make, 2025
Generators1Oldest from 2023

Sweetland Wind Farm, LLC in context

Among the 25 wind plants in South Dakota in the EIA's inventory, it is the 9th largest, about 5.8% of the state's 3.5 GW of wind capacity.

Hand County has 2 power plants of 1 MW or more with 226 MW in all; Sweetland Wind Farm, LLC is 89% of that and the largest of 2 wind plants there.

Its capacity factor of 44% in 2025 is higher than the 32% typical for wind plants across the US.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

02004006008001,000202320242025GWh 765
02004006008001,000202320242025765

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

Sweetland Wind Farm, LLC (outlined) and other plants in Hand County, shaded. 44.387, -98.801.

Plant facts

Operator
Sweetland Wind Farm, LLC
Sector
IPP Non-CHP
Grid operator
SWPP
County
Hand County, SD
EIA plant ID
66496
Where South Dakota's power comes from → South Dakota power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
SLW Onshore Wind Turbine 200 MW 2023 –

Nearby

Other plants in Hand County

Questions

Sweetland Wind Farm, LLC, answered

How much power does Sweetland Wind Farm, LLC produce?

Sweetland Wind Farm, LLC has 200 MW of capacity from one generator. In 2025 it generated 765 GWh, 44% of the most it could have made running flat out all year (its capacity factor).

How many homes does Sweetland Wind Farm, LLC power?

Its 2025 output of 765 GWh equals the yearly electricity use of about 65,000 average South Dakota homes (984 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is Sweetland Wind Farm, LLC?

Sweetland Wind Farm, LLC is in Hand County, South Dakota, at about 44.387°, -98.801°. It is one of 2 power plants of 1 MW or more in the county.

Who operates Sweetland Wind Farm, LLC?

It is operated by Sweetland Wind Farm, LLC (EIA sector: IPP Non-CHP), and it feeds the Southwest Power Pool.

When did Sweetland Wind Farm, LLC open?

Its oldest generator still running came online in 2023.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2023–2025). Homes equivalent uses the average South Dakota home's 984 kWh a month in 2025. Methodology.