Solar power plant · Ross, OH
Ross County Solar, LLC
Ross County Solar, LLC is a 120 MW solar power plant in Ross County, Ohio, operated by Geronimo Power. Its oldest generator still running came online in 2025. In 2025 it generated 219 GWh, about what 21,000 average Ohio homes use in a year.
Ross County Solar, LLC in context
Among the 77 solar plants in Ohio in the EIA's inventory, it is the 16th largest, about 2.4% of the state's 5.0 GW of solar capacity.
Ross County has 5 power plants of 1 MW or more with 582 MW in all; Ross County Solar, LLC is 21% of that and the 2nd largest of 4 solar plants there.
The average electricity customer in Ross County goes 7.8 hours a year without power, the 21st most of 88 counties in Ohio. The county's page has the full outage record.
Seasons
Month by month, 2025
Where it is
Ross County Solar, LLC (outlined) and other plants in Ross County, shaded. 39.326, -83.353.
Plant facts
- Operator
- Geronimo Power
- Sector
- IPP Non-CHP
- Grid operator
- PJM
- County
- Ross County, OH
- EIA plant ID
- 65343
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| ROSS | Solar Photovoltaic | 120 MW | 2025 | – |
Nearby
Other plants in Ross County
Questions
Ross County Solar, LLC, answered
How much power does Ross County Solar, LLC produce?
Ross County Solar, LLC has 120 MW of capacity from one generator. In 2025 it generated 219 GWh.
How many homes does Ross County Solar, LLC power?
Its 2025 output of 219 GWh equals the yearly electricity use of about 21,000 average Ohio homes (874 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Ross County Solar, LLC?
Ross County Solar, LLC is in Ross County, Ohio, at about 39.326°, -83.353°. It is one of 5 power plants of 1 MW or more in the county. The average electricity customer in Ross County goes 7.8 hours a year without power, the 21st most of 88 counties in Ohio. The county's page has the full outage record.
Who operates Ross County Solar, LLC?
It is operated by Geronimo Power (EIA sector: IPP Non-CHP), and it feeds PJM Interconnection.
When did Ross County Solar, LLC open?
Its oldest generator still running came online in 2025.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2025–2025). Homes equivalent uses the average Ohio home's 874 kWh a month in 2025. Methodology.