Salt City Solar Project - Hybrid is a 50 MW solar power plant in Ross County, Ohio, operated by Salt City Solar LLC. Its oldest generator still running came online in 2023. In 2025 it generated 104 GWh, about what 9,900 average Ohio homes use in a year.

Capacity50 MWNameplate, September 2026
Generated104 GWhIn 2025
Capacity factor24%Share of the most it could make, 2025
Generators1Oldest from 2023

Salt City Solar Project - Hybrid in context

Among the 77 solar plants in Ohio in the EIA's inventory, it is the 26th largest, about 1.0% of the state's 5.0 GW of solar capacity.

Ross County has 5 power plants of 1 MW or more with 582 MW in all; Salt City Solar Project - Hybrid is 9% of that and the 3rd largest of 4 solar plants there.

Its capacity factor of 24% in 2025 is higher than the 20% typical for solar plants across the US.

The average electricity customer in Ross County goes 7.8 hours a year without power, the 21st most of 88 counties in Ohio. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

020406080100120202320242025GWh 104
020406080100120202320242025104

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

Salt City Solar Project - Hybrid (outlined) and other plants in Ross County, shaded. 39.415, -82.963.

Plant facts

Operator
Salt City Solar LLC
Sector
IPP Non-CHP
Grid operator
PJM
County
Ross County, OH
EIA plant ID
65302
Where Ohio's power comes from → Ohio power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
SOLAR Solar Photovoltaic 50 MW 2023 –

Planned

GeneratorTechnologyCapacityExpected
BESSBatteries13 MW2027

Questions

Salt City Solar Project - Hybrid, answered

How much power does Salt City Solar Project - Hybrid produce?

Salt City Solar Project - Hybrid has 50 MW of capacity from one generator. In 2025 it generated 104 GWh, 24% of the most it could have made running flat out all year (its capacity factor).

How many homes does Salt City Solar Project - Hybrid power?

Its 2025 output of 104 GWh equals the yearly electricity use of about 9,900 average Ohio homes (874 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is Salt City Solar Project - Hybrid?

Salt City Solar Project - Hybrid is in Ross County, Ohio, at about 39.415°, -82.963°. It is one of 5 power plants of 1 MW or more in the county. The average electricity customer in Ross County goes 7.8 hours a year without power, the 21st most of 88 counties in Ohio. The county's page has the full outage record.

Who operates Salt City Solar Project - Hybrid?

It is operated by Salt City Solar LLC (EIA sector: IPP Non-CHP), and it feeds PJM Interconnection.

When did Salt City Solar Project - Hybrid open?

Its oldest generator still running came online in 2023. 1 more generator is planned.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2023–2025). Homes equivalent uses the average Ohio home's 874 kWh a month in 2025. Methodology.