Solar power plant · Ross, OH
Salt City Solar Project - Hybrid
Salt City Solar Project - Hybrid is a 50 MW solar power plant in Ross County, Ohio, operated by Salt City Solar LLC. Its oldest generator still running came online in 2023. In 2025 it generated 104 GWh, about what 9,900 average Ohio homes use in a year.
Salt City Solar Project - Hybrid in context
Among the 77 solar plants in Ohio in the EIA's inventory, it is the 26th largest, about 1.0% of the state's 5.0 GW of solar capacity.
Ross County has 5 power plants of 1 MW or more with 582 MW in all; Salt City Solar Project - Hybrid is 9% of that and the 3rd largest of 4 solar plants there.
Its capacity factor of 24% in 2025 is higher than the 20% typical for solar plants across the US.
The average electricity customer in Ross County goes 7.8 hours a year without power, the 21st most of 88 counties in Ohio. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Salt City Solar Project - Hybrid (outlined) and other plants in Ross County, shaded. 39.415, -82.963.
Plant facts
- Operator
- Salt City Solar LLC
- Sector
- IPP Non-CHP
- Grid operator
- PJM
- County
- Ross County, OH
- EIA plant ID
- 65302
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| SOLAR | Solar Photovoltaic | 50 MW | 2023 | – |
Planned
| Generator | Technology | Capacity | Expected |
|---|---|---|---|
| BESS | Batteries | 13 MW | 2027 |
Nearby
Other plants in Ross County
Questions
Salt City Solar Project - Hybrid, answered
How much power does Salt City Solar Project - Hybrid produce?
Salt City Solar Project - Hybrid has 50 MW of capacity from one generator. In 2025 it generated 104 GWh, 24% of the most it could have made running flat out all year (its capacity factor).
How many homes does Salt City Solar Project - Hybrid power?
Its 2025 output of 104 GWh equals the yearly electricity use of about 9,900 average Ohio homes (874 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Salt City Solar Project - Hybrid?
Salt City Solar Project - Hybrid is in Ross County, Ohio, at about 39.415°, -82.963°. It is one of 5 power plants of 1 MW or more in the county. The average electricity customer in Ross County goes 7.8 hours a year without power, the 21st most of 88 counties in Ohio. The county's page has the full outage record.
Who operates Salt City Solar Project - Hybrid?
It is operated by Salt City Solar LLC (EIA sector: IPP Non-CHP), and it feeds PJM Interconnection.
When did Salt City Solar Project - Hybrid open?
Its oldest generator still running came online in 2023. 1 more generator is planned.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2023–2025). Homes equivalent uses the average Ohio home's 874 kWh a month in 2025. Methodology.