Solar power plant · Maricopa, AZ
Saddle Mountain Solar I
Saddle Mountain Solar I is a 15 MW solar power plant in Maricopa County, Arizona, operated by SunE AZ2, LLC. Its oldest generator still running came online in 2012. In 2025 it generated 33 GWh, about what 2,700 average Arizona homes use in a year.
Saddle Mountain Solar I in context
Among the 109 solar plants in Arizona in the EIA's inventory, it is the 57th largest, about 0.2% of the state's 9.9 GW of solar capacity.
Maricopa County has 82 power plants of 1 MW or more with 24 GW in all; Saddle Mountain Solar I is 0% of that and the 22nd largest of 40 solar plants there.
Its capacity factor of 25% in 2025 is higher than the 20% typical for solar plants across the US.
The average electricity customer in Maricopa County goes 1.5 hours a year without power, the 7th most of 11 counties in Arizona. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Saddle Mountain Solar I (outlined) and other plants in Maricopa County, shaded. 33.378, -113.181.
Plant facts
- Operator
- SunE AZ2, LLC
- Sector
- IPP Non-CHP
- Grid operator
- AZPS
- County
- Maricopa County, AZ
- EIA plant ID
- 58213
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| AZ2 | Solar Photovoltaic | 15 MW | 2012 | – |
Questions
Saddle Mountain Solar I, answered
How much power does Saddle Mountain Solar I produce?
Saddle Mountain Solar I has 15 MW of capacity from one generator. In 2025 it generated 33 GWh, 25% of the most it could have made running flat out all year (its capacity factor).
How many homes does Saddle Mountain Solar I power?
Its 2025 output of 33 GWh equals the yearly electricity use of about 2,700 average Arizona homes (1,030 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Saddle Mountain Solar I?
Saddle Mountain Solar I is in Maricopa County, Arizona, at about 33.378°, -113.181°. It is one of 82 power plants of 1 MW or more in the county. The average electricity customer in Maricopa County goes 1.5 hours a year without power, the 7th most of 11 counties in Arizona. The county's page has the full outage record.
Who operates Saddle Mountain Solar I?
It is operated by SunE AZ2, LLC (EIA sector: IPP Non-CHP), and it feeds Arizona Public Service.
When did Saddle Mountain Solar I open?
Its oldest generator still running came online in 2012.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Arizona home's 1,030 kWh a month in 2025. Methodology.