Solar power plant · Pinal, AZ
Sandstone Solar
Sandstone Solar is a 45 MW solar power plant in Pinal County, Arizona, operated by AES Distributed Energy. Its oldest generator still running came online in 2015. In 2025 it generated 117 GWh, about what 9,500 average Arizona homes use in a year.
Sandstone Solar in context
Among the 109 solar plants in Arizona in the EIA's inventory, it is the 44th largest, about 0.5% of the state's 9.9 GW of solar capacity.
Pinal County has 22 power plants of 1 MW or more with 4.9 GW in all; Sandstone Solar is 1% of that and the 10th largest of 14 solar plants there.
Its capacity factor of 30% in 2025 is higher than the 20% typical for solar plants across the US.
The average electricity customer in Pinal County goes 1.8 hours a year without power, the 5th most of 11 counties in Arizona. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Sandstone Solar (outlined) and other plants in Pinal County, shaded. 33.036, -111.430.
Plant facts
- Operator
- AES Distributed Energy
- Sector
- IPP Non-CHP
- Grid operator
- SRP
- County
- Pinal County, AZ
- EIA plant ID
- 59634
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| SNDST | Solar Photovoltaic | 45 MW | 2015 | – |
Questions
Sandstone Solar, answered
How much power does Sandstone Solar produce?
Sandstone Solar has 45 MW of capacity from one generator. In 2025 it generated 117 GWh, 30% of the most it could have made running flat out all year (its capacity factor).
How many homes does Sandstone Solar power?
Its 2025 output of 117 GWh equals the yearly electricity use of about 9,500 average Arizona homes (1,030 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Sandstone Solar?
Sandstone Solar is in Pinal County, Arizona, at about 33.036°, -111.430°. It is one of 22 power plants of 1 MW or more in the county. The average electricity customer in Pinal County goes 1.8 hours a year without power, the 5th most of 11 counties in Arizona. The county's page has the full outage record.
Who operates Sandstone Solar?
It is operated by AES Distributed Energy (EIA sector: IPP Non-CHP), and it feeds Salt River Project.
When did Sandstone Solar open?
Its oldest generator still running came online in 2015.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Arizona home's 1,030 kWh a month in 2025. Methodology.