Solar power plant · Bay, FL
Sandy Creek Solar Power Plant
Sandy Creek Solar Power Plant is a 75 MW solar power plant in Bay County, Florida, operated by Duke Energy Florida, LLC. Its oldest generator still running came online in 2022. In 2025 it generated 167 GWh, about what 13,000 average Florida homes use in a year.
Sandy Creek Solar Power Plant in context
Among the 226 solar plants in Florida in the EIA's inventory, it is the 22nd largest, about 0.5% of the state's 14 GW of solar capacity.
Bay County has 5 power plants of 1 MW or more with 961 MW in all; Sandy Creek Solar Power Plant is 8% of that and the largest of 4 solar plants there.
Its capacity factor of 25% in 2025 is higher than the 20% typical for solar plants across the US.
The average electricity customer in Bay County goes 29 hours a year without power, the 8th most of 67 counties in Florida. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Sandy Creek Solar Power Plant (outlined) and other plants in Bay County, shaded. 30.103, -85.410.
Plant facts
- Operator
- Duke Energy Florida, LLC
- Sector
- Electric Utility
- Grid operator
- FPC
- County
- Bay County, FL
- EIA plant ID
- 64146
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| PV1 | Solar Photovoltaic | 75 MW | 2022 | – |
Questions
Sandy Creek Solar Power Plant, answered
How much power does Sandy Creek Solar Power Plant produce?
Sandy Creek Solar Power Plant has 75 MW of capacity from one generator. In 2025 it generated 167 GWh, 25% of the most it could have made running flat out all year (its capacity factor).
How many homes does Sandy Creek Solar Power Plant power?
Its 2025 output of 167 GWh equals the yearly electricity use of about 13,000 average Florida homes (1,103 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Sandy Creek Solar Power Plant?
Sandy Creek Solar Power Plant is in Bay County, Florida, at about 30.103°, -85.410°. It is one of 5 power plants of 1 MW or more in the county. The average electricity customer in Bay County goes 29 hours a year without power, the 8th most of 67 counties in Florida. The county's page has the full outage record.
Who operates Sandy Creek Solar Power Plant?
It is operated by Duke Energy Florida, LLC (EIA sector: Electric Utility), and it feeds balancing authority FPC.
When did Sandy Creek Solar Power Plant open?
Its oldest generator still running came online in 2022.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2022–2025). Homes equivalent uses the average Florida home's 1,103 kWh a month in 2025. Methodology.