Wind power plant · Lee, IL

Shady Oaks Wind 2

Shady Oaks Wind 2 is a 108 MW wind power plant in Lee County, Illinois, operated by Shady Oaks Wind 2, LLC. Its oldest generator still running came online in 2023. In 2025 it generated 318 GWh, about what 37,000 average Illinois homes use in a year.

Capacity108 MWNameplate, September 2026
Generated318 GWhIn 2025
Capacity factor34%Share of the most it could make, 2025
Generators1Oldest from 2023

Shady Oaks Wind 2 in context

Among the 56 wind plants in Illinois in the EIA's inventory, it is the 38th largest, about 1.2% of the state's 8.7 GW of wind capacity.

Lee County has 13 power plants of 1 MW or more with 2.3 GW in all; Shady Oaks Wind 2 is 5% of that and the 3rd largest of 6 wind plants there.

Its capacity factor of 34% in 2025 is close to the 32% typical for wind plants across the US.

The average electricity customer in Lee County goes 4.8 hours a year without power, the 47th most of 101 counties in Illinois. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

0100200300400202320242025GWh 318
0100200300400202320242025318

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

Shady Oaks Wind 2 (outlined) and other plants in Lee County, shaded. 41.667, -89.060.

Plant facts

Operator
Shady Oaks Wind 2, LLC
Sector
IPP Non-CHP
Grid operator
PJM
County
Lee County, IL
EIA plant ID
66568
Where Illinois's power comes from → Illinois power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
SHO02 Onshore Wind Turbine 108 MW 2023 –

Questions

Shady Oaks Wind 2, answered

How much power does Shady Oaks Wind 2 produce?

Shady Oaks Wind 2 has 108 MW of capacity from one generator. In 2025 it generated 318 GWh, 34% of the most it could have made running flat out all year (its capacity factor).

How many homes does Shady Oaks Wind 2 power?

Its 2025 output of 318 GWh equals the yearly electricity use of about 37,000 average Illinois homes (716 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is Shady Oaks Wind 2?

Shady Oaks Wind 2 is in Lee County, Illinois, at about 41.667°, -89.060°. It is one of 13 power plants of 1 MW or more in the county. The average electricity customer in Lee County goes 4.8 hours a year without power, the 47th most of 101 counties in Illinois. The county's page has the full outage record.

Who operates Shady Oaks Wind 2?

It is operated by Shady Oaks Wind 2, LLC (EIA sector: IPP Non-CHP), and it feeds PJM Interconnection.

When did Shady Oaks Wind 2 open?

Its oldest generator still running came online in 2023.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2023–2025). Homes equivalent uses the average Illinois home's 716 kWh a month in 2025. Methodology.