Wind power plant · Lee, IL
Shady Oaks Wind 2
Shady Oaks Wind 2 is a 108 MW wind power plant in Lee County, Illinois, operated by Shady Oaks Wind 2, LLC. Its oldest generator still running came online in 2023. In 2025 it generated 318 GWh, about what 37,000 average Illinois homes use in a year.
Shady Oaks Wind 2 in context
Among the 56 wind plants in Illinois in the EIA's inventory, it is the 38th largest, about 1.2% of the state's 8.7 GW of wind capacity.
Lee County has 13 power plants of 1 MW or more with 2.3 GW in all; Shady Oaks Wind 2 is 5% of that and the 3rd largest of 6 wind plants there.
Its capacity factor of 34% in 2025 is close to the 32% typical for wind plants across the US.
The average electricity customer in Lee County goes 4.8 hours a year without power, the 47th most of 101 counties in Illinois. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Shady Oaks Wind 2 (outlined) and other plants in Lee County, shaded. 41.667, -89.060.
Plant facts
- Operator
- Shady Oaks Wind 2, LLC
- Sector
- IPP Non-CHP
- Grid operator
- PJM
- County
- Lee County, IL
- EIA plant ID
- 66568
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| SHO02 | Onshore Wind Turbine | 108 MW | 2023 | – |
Nearby
Other plants in Lee County
Questions
Shady Oaks Wind 2, answered
How much power does Shady Oaks Wind 2 produce?
Shady Oaks Wind 2 has 108 MW of capacity from one generator. In 2025 it generated 318 GWh, 34% of the most it could have made running flat out all year (its capacity factor).
How many homes does Shady Oaks Wind 2 power?
Its 2025 output of 318 GWh equals the yearly electricity use of about 37,000 average Illinois homes (716 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Shady Oaks Wind 2?
Shady Oaks Wind 2 is in Lee County, Illinois, at about 41.667°, -89.060°. It is one of 13 power plants of 1 MW or more in the county. The average electricity customer in Lee County goes 4.8 hours a year without power, the 47th most of 101 counties in Illinois. The county's page has the full outage record.
Who operates Shady Oaks Wind 2?
It is operated by Shady Oaks Wind 2, LLC (EIA sector: IPP Non-CHP), and it feeds PJM Interconnection.
When did Shady Oaks Wind 2 open?
Its oldest generator still running came online in 2023.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2023–2025). Homes equivalent uses the average Illinois home's 716 kWh a month in 2025. Methodology.