Wind power plant · Lee, IL
Shady Oaks Wind Farm
Shady Oaks Wind Farm is a 110 MW wind power plant in Lee County, Illinois, operated by Algonquin Power Co. Its oldest generator still running came online in 2012. In 2025 it generated 302 GWh, about what 35,000 average Illinois homes use in a year.
Shady Oaks Wind Farm in context
Among the 56 wind plants in Illinois in the EIA's inventory, it is the 37th largest, about 1.3% of the state's 8.7 GW of wind capacity.
Lee County has 13 power plants of 1 MW or more with 2.3 GW in all; Shady Oaks Wind Farm is 5% of that and the 2nd largest of 6 wind plants there.
Its capacity factor of 32% in 2025 is close to the 32% typical for wind plants across the US.
The average electricity customer in Lee County goes 4.8 hours a year without power, the 47th most of 101 counties in Illinois. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Shady Oaks Wind Farm (outlined) and other plants in Lee County, shaded. 41.667, -89.060.
Plant facts
- Operator
- Algonquin Power Co
- Sector
- IPP Non-CHP
- Grid operator
- PJM
- County
- Lee County, IL
- EIA plant ID
- 57964
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| 1 | Onshore Wind Turbine | 110 MW | 2012 | – |
Nearby
Other plants in Lee County
Questions
Shady Oaks Wind Farm, answered
How much power does Shady Oaks Wind Farm produce?
Shady Oaks Wind Farm has 110 MW of capacity from one generator. In 2025 it generated 302 GWh, 32% of the most it could have made running flat out all year (its capacity factor).
How many homes does Shady Oaks Wind Farm power?
Its 2025 output of 302 GWh equals the yearly electricity use of about 35,000 average Illinois homes (716 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Shady Oaks Wind Farm?
Shady Oaks Wind Farm is in Lee County, Illinois, at about 41.667°, -89.060°. It is one of 13 power plants of 1 MW or more in the county. The average electricity customer in Lee County goes 4.8 hours a year without power, the 47th most of 101 counties in Illinois. The county's page has the full outage record.
Who operates Shady Oaks Wind Farm?
It is operated by Algonquin Power Co (EIA sector: IPP Non-CHP), and it feeds PJM Interconnection.
When did Shady Oaks Wind Farm open?
Its oldest generator still running came online in 2012.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Illinois home's 716 kWh a month in 2025. Methodology.