Natural gas power plant · Harris, TX
Shell Deer Park
Shell Deer Park is a 274 MW natural gas power plant in Harris County, Texas, operated by Deer Park Refinery Limited Partnership (DPRLP). Its oldest generator still running came online in 1979. In 2025 it generated 1.1 TWh, about what 84,000 average Texas homes use in a year.
Shell Deer Park in context
Among the 309 natural gas plants in Texas in the EIA's inventory, it is the 100th largest, about 0.3% of the state's 83 GW of natural gas capacity.
Harris County has 86 power plants of 1 MW or more with 11 GW in all; Shell Deer Park is 2% of that and the 14th largest of 66 natural gas plants there.
Its capacity factor of 47% in 2025 is higher than the 23% typical for natural gas plants across the US.
The average electricity customer in Harris County goes 16 hours a year without power, the 66th most of 240 counties in Texas. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Shell Deer Park (outlined) and other plants in Harris County, shaded. 29.723, -95.129.
Plant facts
- Operator
- Deer Park Refinery Limited Partnership (DPRLP)
- Sector
- Industrial CHP
- Grid operator
- ERCO
- County
- Harris County, TX
- EIA plant ID
- 50304
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| GEN5 | Natural Gas Fired Combustion Turbine | 94 MW | 1995 | – |
| GEN4 | Natural Gas Fired Combustion Turbine | 88 MW | 1995 | – |
| GEN1 | All Other | 46 MW | 1979 | – |
| GEN2 | All Other | 46 MW | 1979 | – |
Questions
Shell Deer Park, answered
How much power does Shell Deer Park produce?
Shell Deer Park has 274 MW of capacity from 4 generators. In 2025 it generated 1.1 TWh, 47% of the most it could have made running flat out all year (its capacity factor).
How many homes does Shell Deer Park power?
Its 2025 output of 1.1 TWh equals the yearly electricity use of about 84,000 average Texas homes (1,110 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Shell Deer Park?
Shell Deer Park is in Harris County, Texas, at about 29.723°, -95.129°. It is one of 86 power plants of 1 MW or more in the county. The average electricity customer in Harris County goes 16 hours a year without power, the 66th most of 240 counties in Texas. The county's page has the full outage record.
Who operates Shell Deer Park?
It is operated by Deer Park Refinery Limited Partnership (DPRLP) (EIA sector: Industrial CHP), and it feeds ERCOT, the Texas grid.
When did Shell Deer Park open?
Its oldest generator still running came online in 1979.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Texas home's 1,110 kWh a month in 2025. Methodology.