Solar power plant · Palm Beach, FL

Silver Palm

Silver Palm is a 75 MW solar power plant in Palm Beach County, Florida, operated by Florida Power & Light Co. Its oldest generator still running came online in 2024. In 2025 it generated 155 GWh, about what 12,000 average Florida homes use in a year.

Capacity75 MWNameplate, September 2026
Generated155 GWhIn 2025
Capacity factor24%Share of the most it could make, 2025
Generators1Oldest from 2024

Silver Palm in context

Among the 226 solar plants in Florida in the EIA's inventory, it is the 118th largest, about 0.5% of the state's 14 GW of solar capacity.

Palm Beach County has 10 power plants of 1 MW or more with 6.2 GW in all; Silver Palm is 1% of that and the 3rd largest of 4 solar plants there.

Its capacity factor of 24% in 2025 is higher than the 20% typical for solar plants across the US.

The average electricity customer in Palm Beach County goes 2.7 hours a year without power, the 61st most of 67 counties in Florida. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

05010015020020242025GWh 155
05010015020020242025155

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

Silver Palm (outlined) and other plants in Palm Beach County, shaded. 26.788, -80.352.

Plant facts

Operator
Florida Power & Light Co
Sector
Electric Utility
Grid operator
FPL
County
Palm Beach County, FL
EIA plant ID
65878
Where Florida's power comes from → Florida power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
1 Solar Photovoltaic 75 MW 2024 –

Questions

Silver Palm, answered

How much power does Silver Palm produce?

Silver Palm has 75 MW of capacity from one generator. In 2025 it generated 155 GWh, 24% of the most it could have made running flat out all year (its capacity factor).

How many homes does Silver Palm power?

Its 2025 output of 155 GWh equals the yearly electricity use of about 12,000 average Florida homes (1,103 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is Silver Palm?

Silver Palm is in Palm Beach County, Florida, at about 26.788°, -80.352°. It is one of 10 power plants of 1 MW or more in the county. The average electricity customer in Palm Beach County goes 2.7 hours a year without power, the 61st most of 67 counties in Florida. The county's page has the full outage record.

Who operates Silver Palm?

It is operated by Florida Power & Light Co (EIA sector: Electric Utility), and it feeds Florida Power & Light.

When did Silver Palm open?

Its oldest generator still running came online in 2024.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2024–2025). Homes equivalent uses the average Florida home's 1,103 kWh a month in 2025. Methodology.