Solar power plant · Maricopa, AZ

Sun Pond

Sun Pond is a 170 MW solar power plant in Maricopa County, Arizona, operated by Sun Pond, LLC. Its oldest generator still running came online in 2026.

Capacity170 MWNameplate, September 2026
Generated–Not reported
Capacity factor–Not a full year of data
Generators2Oldest from 2026

Sun Pond in context

Among the 109 solar plants in Arizona in the EIA's inventory, it is the 17th largest, about 1.7% of the state's 9.9 GW of solar capacity.

Maricopa County has 82 power plants of 1 MW or more with 24 GW in all; Sun Pond is 1% of that and the 7th largest of 40 solar plants there.

The average electricity customer in Maricopa County goes 1.5 hours a year without power, the 7th most of 11 counties in Arizona. The county's page has the full outage record.

Where it is

Sun Pond (outlined) and other plants in Maricopa County, shaded. 33.381, -112.822.

Plant facts

Operator
Sun Pond, LLC
Sector
IPP Non-CHP
Grid operator
SRP
County
Maricopa County, AZ
EIA plant ID
68492
  • Solar85 MW50%
  • Storage85 MW50%
Where Arizona's power comes from → Arizona power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
GEN01 Solar Photovoltaic 85 MW 2026 –
GEN02 Batteries 85 MW · 340 MWh 2026 –

Questions

Sun Pond, answered

How much power does Sun Pond produce?

Sun Pond has 170 MW of capacity from 2 generators. No full year of generation is reported yet.

Where is Sun Pond?

Sun Pond is in Maricopa County, Arizona, at about 33.381°, -112.822°. It is one of 82 power plants of 1 MW or more in the county. The average electricity customer in Maricopa County goes 1.5 hours a year without power, the 7th most of 11 counties in Arizona. The county's page has the full outage record.

Who operates Sun Pond?

It is operated by Sun Pond, LLC (EIA sector: IPP Non-CHP), and it feeds Salt River Project.

When did Sun Pond open?

Its oldest generator still running came online in 2026.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2025–2025). Methodology.