Solar power plant · Madison, FL
Sundance Renewable Energy Center
Sundance Renewable Energy Center is a 75 MW solar power plant in Madison County, Florida, operated by Duke Energy Florida, LLC. Its oldest generator still running came online in 2025. In 2025 it generated 88 GWh, about what 6,700 average Florida homes use in a year.
Sundance Renewable Energy Center in context
Among the 226 solar plants in Florida in the EIA's inventory, it is the 34th largest, about 0.5% of the state's 14 GW of solar capacity.
Madison County has 3 power plants of 1 MW or more with 224 MW in all; Sundance Renewable Energy Center is 33% of that and the 2nd largest of 3 solar plants there.
The average electricity customer in Madison County goes 43 hours a year without power, the 1st most of 67 counties in Florida. The county's page has the full outage record.
Seasons
Month by month, 2025
Where it is
Sundance Renewable Energy Center (outlined) and other plants in Madison County, shaded. 30.267, -83.296.
Plant facts
- Operator
- Duke Energy Florida, LLC
- Sector
- Electric Utility
- Grid operator
- FPC
- County
- Madison County, FL
- EIA plant ID
- 67692
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| 68049 | Solar Photovoltaic | 75 MW | 2025 | – |
Nearby
Other plants in Madison County
Questions
Sundance Renewable Energy Center, answered
How much power does Sundance Renewable Energy Center produce?
Sundance Renewable Energy Center has 75 MW of capacity from one generator. In 2025 it generated 88 GWh.
How many homes does Sundance Renewable Energy Center power?
Its 2025 output of 88 GWh equals the yearly electricity use of about 6,700 average Florida homes (1,103 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Sundance Renewable Energy Center?
Sundance Renewable Energy Center is in Madison County, Florida, at about 30.267°, -83.296°. It is one of 3 power plants of 1 MW or more in the county. The average electricity customer in Madison County goes 43 hours a year without power, the 1st most of 67 counties in Florida. The county's page has the full outage record.
Who operates Sundance Renewable Energy Center?
It is operated by Duke Energy Florida, LLC (EIA sector: Electric Utility), and it feeds balancing authority FPC.
When did Sundance Renewable Energy Center open?
Its oldest generator still running came online in 2025.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2025–2025). Homes equivalent uses the average Florida home's 1,103 kWh a month in 2025. Methodology.