Solar power plant · Bexar, TX

SunE CPS2 LLC

SunE CPS2 LLC is a 10 MW solar power plant in Bexar County, Texas, operated by REC Solar. Its oldest generator still running came online in 2012. In 2025 it generated 3.2 GWh, about what 240 average Texas homes use in a year.

Capacity10 MWNameplate, September 2026
Generated3.2 GWhIn 2025
Capacity factor4%Share of the most it could make, 2025
Generators1Oldest from 2012

SunE CPS2 LLC in context

Among the 250 solar plants in Texas in the EIA's inventory, it is the 182nd largest, about 0.0% of the state's 37 GW of solar capacity.

Bexar County has 26 power plants of 1 MW or more with 5.0 GW in all; SunE CPS2 LLC is 0% of that and the 4th largest of 10 solar plants there.

Its capacity factor of 4% in 2025 is lower than the 20% typical for solar plants across the US.

The average electricity customer in Bexar County goes 3.3 hours a year without power, the 219th most of 240 counties in Texas. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

0510152020182019202020212022202320242025GWh 3
0510152020192021202320253

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

SunE CPS2 LLC (outlined) and other plants in Bexar County, shaded. 29.245, -98.418.

Plant facts

Operator
REC Solar
Sector
IPP Non-CHP
Grid operator
ERCO
County
Bexar County, TX
EIA plant ID
58027
Where Texas's power comes from → Texas power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
1 Solar Photovoltaic 10 MW 2012 –

Questions

SunE CPS2 LLC, answered

How much power does SunE CPS2 LLC produce?

SunE CPS2 LLC has 10 MW of capacity from one generator. In 2025 it generated 3.2 GWh, 4% of the most it could have made running flat out all year (its capacity factor).

How many homes does SunE CPS2 LLC power?

Its 2025 output of 3.2 GWh equals the yearly electricity use of about 240 average Texas homes (1,110 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is SunE CPS2 LLC?

SunE CPS2 LLC is in Bexar County, Texas, at about 29.245°, -98.418°. It is one of 26 power plants of 1 MW or more in the county. The average electricity customer in Bexar County goes 3.3 hours a year without power, the 219th most of 240 counties in Texas. The county's page has the full outage record.

Who operates SunE CPS2 LLC?

It is operated by REC Solar (EIA sector: IPP Non-CHP), and it feeds ERCOT, the Texas grid.

When did SunE CPS2 LLC open?

Its oldest generator still running came online in 2012.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Texas home's 1,110 kWh a month in 2025. Methodology.