Solar power plant · Bexar, TX
SunE CPS3 LLC
SunE CPS3 LLC is a 11 MW solar power plant in Bexar County, Texas, operated by REC Solar. Its oldest generator still running came online in 2012. In 2025 it generated 3.0 GWh, about what 225 average Texas homes use in a year.
SunE CPS3 LLC in context
Among the 250 solar plants in Texas in the EIA's inventory, it is the 180th largest, about 0.0% of the state's 37 GW of solar capacity.
Bexar County has 26 power plants of 1 MW or more with 5.0 GW in all; SunE CPS3 LLC is 0% of that and the 3rd largest of 10 solar plants there.
Its capacity factor of 3% in 2025 is lower than the 20% typical for solar plants across the US.
The average electricity customer in Bexar County goes 3.3 hours a year without power, the 219th most of 240 counties in Texas. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
SunE CPS3 LLC (outlined) and other plants in Bexar County, shaded. 29.222, -98.669.
Plant facts
- Operator
- REC Solar
- Sector
- IPP Non-CHP
- Grid operator
- ERCO
- County
- Bexar County, TX
- EIA plant ID
- 58009
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| 1 | Solar Photovoltaic | 5.6 MW | 2012 | – |
| 2 | Solar Photovoltaic | 5.0 MW | 2012 | – |
Questions
SunE CPS3 LLC, answered
How much power does SunE CPS3 LLC produce?
SunE CPS3 LLC has 11 MW of capacity from 2 generators. In 2025 it generated 3.0 GWh, 3% of the most it could have made running flat out all year (its capacity factor).
How many homes does SunE CPS3 LLC power?
Its 2025 output of 3.0 GWh equals the yearly electricity use of about 225 average Texas homes (1,110 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is SunE CPS3 LLC?
SunE CPS3 LLC is in Bexar County, Texas, at about 29.222°, -98.669°. It is one of 26 power plants of 1 MW or more in the county. The average electricity customer in Bexar County goes 3.3 hours a year without power, the 219th most of 240 counties in Texas. The county's page has the full outage record.
Who operates SunE CPS3 LLC?
It is operated by REC Solar (EIA sector: IPP Non-CHP), and it feeds ERCOT, the Texas grid.
When did SunE CPS3 LLC open?
Its oldest generator still running came online in 2012.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Texas home's 1,110 kWh a month in 2025. Methodology.