Solar power plant · Columbia, FL

Sunshine Gateway Solar Energy Center

Sunshine Gateway Solar Energy Center is a 105 MW solar power plant in Columbia County, Florida, operated by Florida Power & Light Co. Its oldest generator still running came online in 2019. In 2025 it generated 135 GWh, about what 10,000 average Florida homes use in a year.

Capacity105 MWNameplate, September 2026
Generated135 GWhIn 2025
Capacity factor15%Share of the most it could make, 2025
Generators2Oldest from 2019

Sunshine Gateway Solar Energy Center in context

Among the 226 solar plants in Florida in the EIA's inventory, it is the 10th largest, about 0.7% of the state's 14 GW of solar capacity.

Columbia County has 5 power plants of 1 MW or more with 403 MW in all; Sunshine Gateway Solar Energy Center is 26% of that and the largest of 5 solar plants there.

Its capacity factor of 15% in 2025 is lower than the 20% typical for solar plants across the US.

The average electricity customer in Columbia County goes 18 hours a year without power, the 18th most of 67 counties in Florida. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

0501001502002019202020212022202320242025GWh 135
0501001502002019202120232025135

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

Sunshine Gateway Solar Energy Center (outlined) and other plants in Columbia County, shaded. 30.290, -82.750.

Plant facts

Operator
Florida Power & Light Co
Sector
Electric Utility
Grid operator
FPL
County
Columbia County, FL
EIA plant ID
61763
  • Solar75 MW71%
  • Storage30 MW29%
Where Florida's power comes from → Florida power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
1 Solar Photovoltaic 75 MW 2019 –
2 Batteries 30 MW · 75 MWh 2021 –

Questions

Sunshine Gateway Solar Energy Center, answered

How much power does Sunshine Gateway Solar Energy Center produce?

Sunshine Gateway Solar Energy Center has 105 MW of capacity from 2 generators. In 2025 it generated 135 GWh, 15% of the most it could have made running flat out all year (its capacity factor).

How many homes does Sunshine Gateway Solar Energy Center power?

Its 2025 output of 135 GWh equals the yearly electricity use of about 10,000 average Florida homes (1,103 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is Sunshine Gateway Solar Energy Center?

Sunshine Gateway Solar Energy Center is in Columbia County, Florida, at about 30.290°, -82.750°. It is one of 5 power plants of 1 MW or more in the county. The average electricity customer in Columbia County goes 18 hours a year without power, the 18th most of 67 counties in Florida. The county's page has the full outage record.

Who operates Sunshine Gateway Solar Energy Center?

It is operated by Florida Power & Light Co (EIA sector: Electric Utility), and it feeds Florida Power & Light.

When did Sunshine Gateway Solar Energy Center open?

Its oldest generator still running came online in 2019.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2019–2025). Homes equivalent uses the average Florida home's 1,103 kWh a month in 2025. Methodology.