TECO CHP-1 is a 98 MW natural gas power plant in Harris County, Texas, operated by Texas Medical Center Central. Its oldest generator still running came online in 2010. In 2025 it generated 63 GWh, about what 4,700 average Texas homes use in a year.

Capacity98 MWNameplate, September 2026
Generated63 GWhIn 2025
Capacity factor7%Share of the most it could make, 2025
Generators2Oldest from 2010

TECO CHP-1 in context

Among the 309 natural gas plants in Texas in the EIA's inventory, it is the 138th largest, about 0.1% of the state's 83 GW of natural gas capacity.

Harris County has 86 power plants of 1 MW or more with 11 GW in all; TECO CHP-1 is 1% of that and the 21st largest of 66 natural gas plants there.

Its capacity factor of 7% in 2025 is lower than the 23% typical for natural gas plants across the US.

The average electricity customer in Harris County goes 16 hours a year without power, the 66th most of 240 counties in Texas. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

05010015020020182019202020212022202320242025GWh 63
050100150200201920212023202563

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

TECO CHP-1 (outlined) and other plants in Harris County, shaded. 29.703, -95.398.

Plant facts

Operator
Texas Medical Center Central
Sector
Commercial CHP
Grid operator
ERCO
County
Harris County, TX
EIA plant ID
57504
Where Texas's power comes from → Texas power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
GTG2 Natural Gas Fired Combustion Turbine 50 MW 2024 –
CHP1 Natural Gas Fired Combustion Turbine 48 MW 2010 –

Questions

TECO CHP-1, answered

How much power does TECO CHP-1 produce?

TECO CHP-1 has 98 MW of capacity from 2 generators. In 2025 it generated 63 GWh, 7% of the most it could have made running flat out all year (its capacity factor).

How many homes does TECO CHP-1 power?

Its 2025 output of 63 GWh equals the yearly electricity use of about 4,700 average Texas homes (1,110 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is TECO CHP-1?

TECO CHP-1 is in Harris County, Texas, at about 29.703°, -95.398°. It is one of 86 power plants of 1 MW or more in the county. The average electricity customer in Harris County goes 16 hours a year without power, the 66th most of 240 counties in Texas. The county's page has the full outage record.

Who operates TECO CHP-1?

It is operated by Texas Medical Center Central (EIA sector: Commercial CHP), and it feeds ERCOT, the Texas grid.

When did TECO CHP-1 open?

Its oldest generator still running came online in 2010.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Texas home's 1,110 kWh a month in 2025. Methodology.