Solar power plant · Clay, FL
Terrill Creek
Terrill Creek is a 75 MW solar power plant in Clay County, Florida, operated by Florida Power & Light Co. Its oldest generator still running came online in 2024. In 2025 it generated 163 GWh, about what 12,000 average Florida homes use in a year.
Terrill Creek in context
Among the 226 solar plants in Florida in the EIA's inventory, it is the 120th largest, about 0.5% of the state's 14 GW of solar capacity.
Clay County has 3 power plants of 1 MW or more with 224 MW in all; Terrill Creek is 33% of that and the 3rd largest of 3 solar plants there.
Its capacity factor of 25% in 2025 is higher than the 20% typical for solar plants across the US.
The average electricity customer in Clay County goes 4.3 hours a year without power, the 53rd most of 67 counties in Florida. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Terrill Creek (outlined) and other plants in Clay County, shaded. 29.881, -81.763.
Plant facts
- Operator
- Florida Power & Light Co
- Sector
- Electric Utility
- Grid operator
- FPL
- County
- Clay County, FL
- EIA plant ID
- 65882
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| 1 | Solar Photovoltaic | 75 MW | 2024 | – |
Nearby
Other plants in Clay County
Questions
Terrill Creek, answered
How much power does Terrill Creek produce?
Terrill Creek has 75 MW of capacity from one generator. In 2025 it generated 163 GWh, 25% of the most it could have made running flat out all year (its capacity factor).
How many homes does Terrill Creek power?
Its 2025 output of 163 GWh equals the yearly electricity use of about 12,000 average Florida homes (1,103 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Terrill Creek?
Terrill Creek is in Clay County, Florida, at about 29.881°, -81.763°. It is one of 3 power plants of 1 MW or more in the county. The average electricity customer in Clay County goes 4.3 hours a year without power, the 53rd most of 67 counties in Florida. The county's page has the full outage record.
Who operates Terrill Creek?
It is operated by Florida Power & Light Co (EIA sector: Electric Utility), and it feeds Florida Power & Light.
When did Terrill Creek open?
Its oldest generator still running came online in 2024.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2024–2025). Homes equivalent uses the average Florida home's 1,103 kWh a month in 2025. Methodology.