Other power plant · Galveston, TX

Texas City Plant Union Carbide

Texas City Plant Union Carbide is a 26 MW other power plant in Galveston County, Texas, operated by Union Carbide Corp-Texas City. Its oldest generator still running came online in 1996. In 2025 it generated 83 GWh, about what 6,200 average Texas homes use in a year.

Capacity26 MWNameplate, September 2026
Generated83 GWhIn 2025
Capacity factor37%Share of the most it could make, 2025
Generators1Oldest from 1996

Texas City Plant Union Carbide in context

Among the 50 other-fuel plants in Texas in the EIA's inventory, it is the 13th largest, about 1.6% of the state's 1.6 GW of other-fuel capacity.

Galveston County has 20 power plants of 1 MW or more with 3.2 GW in all; Texas City Plant Union Carbide is 1% of that and the 2nd largest of 3 other plants there.

Its capacity factor of 37% in 2025 is higher than the 25% typical for other plants across the US.

The average electricity customer in Galveston County goes 23 hours a year without power, the 31st most of 240 counties in Texas. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

02040608010020182019202020212022202320242025GWh 83
020406080100201920212023202583

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

Texas City Plant Union Carbide (outlined) and other plants in Galveston County, shaded. 29.376, -94.946.

Plant facts

Operator
Union Carbide Corp-Texas City
Sector
Industrial CHP
Grid operator
ERCO
County
Galveston County, TX
EIA plant ID
50153
Where Texas's power comes from → Texas power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
STG All Other 26 MW 1996 –

Retired

GeneratorTechnologyCapacityOnlineRetired
GTGNatural Gas Fired Combustion Turbine40 MW19962014

Questions

Texas City Plant Union Carbide, answered

How much power does Texas City Plant Union Carbide produce?

Texas City Plant Union Carbide has 26 MW of capacity from one generator. In 2025 it generated 83 GWh, 37% of the most it could have made running flat out all year (its capacity factor).

How many homes does Texas City Plant Union Carbide power?

Its 2025 output of 83 GWh equals the yearly electricity use of about 6,200 average Texas homes (1,110 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is Texas City Plant Union Carbide?

Texas City Plant Union Carbide is in Galveston County, Texas, at about 29.376°, -94.946°. It is one of 20 power plants of 1 MW or more in the county. The average electricity customer in Galveston County goes 23 hours a year without power, the 31st most of 240 counties in Texas. The county's page has the full outage record.

Who operates Texas City Plant Union Carbide?

It is operated by Union Carbide Corp-Texas City (EIA sector: Industrial CHP), and it feeds ERCOT, the Texas grid.

When did Texas City Plant Union Carbide open?

Its oldest generator still running came online in 1996.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Texas home's 1,110 kWh a month in 2025. Methodology.