Other power plant · Galveston, TX
Texas City Plant Union Carbide
Texas City Plant Union Carbide is a 26 MW other power plant in Galveston County, Texas, operated by Union Carbide Corp-Texas City. Its oldest generator still running came online in 1996. In 2025 it generated 83 GWh, about what 6,200 average Texas homes use in a year.
Texas City Plant Union Carbide in context
Among the 50 other-fuel plants in Texas in the EIA's inventory, it is the 13th largest, about 1.6% of the state's 1.6 GW of other-fuel capacity.
Galveston County has 20 power plants of 1 MW or more with 3.2 GW in all; Texas City Plant Union Carbide is 1% of that and the 2nd largest of 3 other plants there.
Its capacity factor of 37% in 2025 is higher than the 25% typical for other plants across the US.
The average electricity customer in Galveston County goes 23 hours a year without power, the 31st most of 240 counties in Texas. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Texas City Plant Union Carbide (outlined) and other plants in Galveston County, shaded. 29.376, -94.946.
Plant facts
- Operator
- Union Carbide Corp-Texas City
- Sector
- Industrial CHP
- Grid operator
- ERCO
- County
- Galveston County, TX
- EIA plant ID
- 50153
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| STG | All Other | 26 MW | 1996 | – |
Retired
| Generator | Technology | Capacity | Online | Retired |
|---|---|---|---|---|
| GTG | Natural Gas Fired Combustion Turbine | 40 MW | 1996 | 2014 |
Questions
Texas City Plant Union Carbide, answered
How much power does Texas City Plant Union Carbide produce?
Texas City Plant Union Carbide has 26 MW of capacity from one generator. In 2025 it generated 83 GWh, 37% of the most it could have made running flat out all year (its capacity factor).
How many homes does Texas City Plant Union Carbide power?
Its 2025 output of 83 GWh equals the yearly electricity use of about 6,200 average Texas homes (1,110 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Texas City Plant Union Carbide?
Texas City Plant Union Carbide is in Galveston County, Texas, at about 29.376°, -94.946°. It is one of 20 power plants of 1 MW or more in the county. The average electricity customer in Galveston County goes 23 hours a year without power, the 31st most of 240 counties in Texas. The county's page has the full outage record.
Who operates Texas City Plant Union Carbide?
It is operated by Union Carbide Corp-Texas City (EIA sector: Industrial CHP), and it feeds ERCOT, the Texas grid.
When did Texas City Plant Union Carbide open?
Its oldest generator still running came online in 1996.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Texas home's 1,110 kWh a month in 2025. Methodology.