Solar power plant · St. Johns, FL
Trailside Solar Center
Trailside Solar Center is a 75 MW solar power plant in St. Johns County, Florida, operated by Florida Power & Light Co. Its oldest generator still running came online in 2020. In 2025 it generated 136 GWh, about what 10,000 average Florida homes use in a year.
Trailside Solar Center in context
Among the 226 solar plants in Florida in the EIA's inventory, it is the 65th largest, about 0.5% of the state's 14 GW of solar capacity.
Its capacity factor of 21% in 2025 is close to the 20% typical for solar plants across the US.
The average electricity customer in St. Johns County goes 3.6 hours a year without power, the 56th most of 67 counties in Florida. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Trailside Solar Center (outlined) and other plants in St. Johns County, shaded. 29.775, -81.428.
Plant facts
- Operator
- Florida Power & Light Co
- Sector
- Electric Utility
- Grid operator
- FPL
- County
- St. Johns County, FL
- EIA plant ID
- 62916
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| 1 | Solar Photovoltaic | 75 MW | 2020 | – |
Questions
Trailside Solar Center, answered
How much power does Trailside Solar Center produce?
Trailside Solar Center has 75 MW of capacity from one generator. In 2025 it generated 136 GWh, 21% of the most it could have made running flat out all year (its capacity factor).
How many homes does Trailside Solar Center power?
Its 2025 output of 136 GWh equals the yearly electricity use of about 10,000 average Florida homes (1,103 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Trailside Solar Center?
Trailside Solar Center is in St. Johns County, Florida, at about 29.775°, -81.428°. The average electricity customer in St. Johns County goes 3.6 hours a year without power, the 56th most of 67 counties in Florida. The county's page has the full outage record.
Who operates Trailside Solar Center?
It is operated by Florida Power & Light Co (EIA sector: Electric Utility), and it feeds Florida Power & Light.
When did Trailside Solar Center open?
Its oldest generator still running came online in 2020.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2020–2025). Homes equivalent uses the average Florida home's 1,103 kWh a month in 2025. Methodology.