Wind power plant · Uinta, WY

TransAlta Wyoming Wind

TransAlta Wyoming Wind is a 144 MW wind power plant in Uinta County, Wyoming, operated by TransAlta Wyoming Wind LLC. Its oldest generator still running came online in 2003. In 2025 it generated 321 GWh, about what 32,000 average Wyoming homes use in a year.

Capacity144 MWNameplate, September 2026
Generated321 GWhIn 2025
Capacity factor26%Share of the most it could make, 2025
Generators1Oldest from 2003

TransAlta Wyoming Wind in context

Among the 28 wind plants in Wyoming in the EIA's inventory, it is the 12th largest, about 3.1% of the state's 4.7 GW of wind capacity.

Uinta County has 3 power plants of 1 MW or more with 285 MW in all; TransAlta Wyoming Wind is 51% of that and the largest of 3 wind plants there.

Its capacity factor of 26% in 2025 is lower than the 32% typical for wind plants across the US.

The average electricity customer in Uinta County goes 0.9 hours a year without power, the 19th most of 20 counties in Wyoming. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

010020030040050020182019202020212022202320242025GWh 321
01002003004005002019202120232025321

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

TransAlta Wyoming Wind (outlined) and other plants in Uinta County, shaded. 41.287, -110.556.

Plant facts

Operator
TransAlta Wyoming Wind LLC
Sector
IPP Non-CHP
Grid operator
PACE
County
Uinta County, WY
EIA plant ID
56093
Where Wyoming's power comes from → Wyoming power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
GE15 Onshore Wind Turbine 144 MW 2003 –

Questions

TransAlta Wyoming Wind, answered

How much power does TransAlta Wyoming Wind produce?

TransAlta Wyoming Wind has 144 MW of capacity from one generator. In 2025 it generated 321 GWh, 26% of the most it could have made running flat out all year (its capacity factor).

How many homes does TransAlta Wyoming Wind power?

Its 2025 output of 321 GWh equals the yearly electricity use of about 32,000 average Wyoming homes (835 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is TransAlta Wyoming Wind?

TransAlta Wyoming Wind is in Uinta County, Wyoming, at about 41.287°, -110.556°. It is one of 3 power plants of 1 MW or more in the county. The average electricity customer in Uinta County goes 0.9 hours a year without power, the 19th most of 20 counties in Wyoming. The county's page has the full outage record.

Who operates TransAlta Wyoming Wind?

It is operated by TransAlta Wyoming Wind LLC (EIA sector: IPP Non-CHP), and it feeds PacifiCorp East.

When did TransAlta Wyoming Wind open?

Its oldest generator still running came online in 2003.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Wyoming home's 835 kWh a month in 2025. Methodology.