Solar power plant · Hamilton, FL
Twin Rivers Solar Power Plant
Twin Rivers Solar Power Plant is a 75 MW solar power plant in Hamilton County, Florida, operated by Duke Energy Florida, LLC. Its oldest generator still running came online in 2021. In 2025 it generated 166 GWh, about what 13,000 average Florida homes use in a year.
Twin Rivers Solar Power Plant in context
Among the 226 solar plants in Florida in the EIA's inventory, it is the 19th largest, about 0.5% of the state's 14 GW of solar capacity.
Hamilton County has 4 power plants of 1 MW or more with 174 MW in all; Twin Rivers Solar Power Plant is 43% of that and the 2nd largest of 2 solar plants there.
Its capacity factor of 25% in 2025 is higher than the 20% typical for solar plants across the US.
The average electricity customer in Hamilton County goes 33 hours a year without power, the 4th most of 67 counties in Florida. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Twin Rivers Solar Power Plant (outlined) and other plants in Hamilton County, shaded. 30.466, -82.969.
Plant facts
- Operator
- Duke Energy Florida, LLC
- Sector
- Electric Utility
- Grid operator
- FPC
- County
- Hamilton County, FL
- EIA plant ID
- 63518
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| PV1 | Solar Photovoltaic | 75 MW | 2021 | – |
Nearby
Other plants in Hamilton County
Questions
Twin Rivers Solar Power Plant, answered
How much power does Twin Rivers Solar Power Plant produce?
Twin Rivers Solar Power Plant has 75 MW of capacity from one generator. In 2025 it generated 166 GWh, 25% of the most it could have made running flat out all year (its capacity factor).
How many homes does Twin Rivers Solar Power Plant power?
Its 2025 output of 166 GWh equals the yearly electricity use of about 13,000 average Florida homes (1,103 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Twin Rivers Solar Power Plant?
Twin Rivers Solar Power Plant is in Hamilton County, Florida, at about 30.466°, -82.969°. It is one of 4 power plants of 1 MW or more in the county. The average electricity customer in Hamilton County goes 33 hours a year without power, the 4th most of 67 counties in Florida. The county's page has the full outage record.
Who operates Twin Rivers Solar Power Plant?
It is operated by Duke Energy Florida, LLC (EIA sector: Electric Utility), and it feeds balancing authority FPC.
When did Twin Rivers Solar Power Plant open?
Its oldest generator still running came online in 2021.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2021–2025). Homes equivalent uses the average Florida home's 1,103 kWh a month in 2025. Methodology.