Wind power plant · Deaf Smith, TX

TX Hereford Wind

TX Hereford Wind is a 200 MW wind power plant in Deaf Smith County, Texas, operated by Boralex US Operations LLC. Its oldest generator still running came online in 2014. In 2025 it generated 526 GWh, about what 40,000 average Texas homes use in a year.

Capacity200 MWNameplate, September 2026
Generated526 GWhIn 2025
Capacity factor30%Share of the most it could make, 2025
Generators1Oldest from 2014

TX Hereford Wind in context

Among the 230 wind plants in Texas in the EIA's inventory, it is the 102nd largest, about 0.4% of the state's 45 GW of wind capacity.

Deaf Smith County has 3 power plants of 1 MW or more with 710 MW in all; TX Hereford Wind is 28% of that and the 3rd largest of 3 wind plants there.

Its capacity factor of 30% in 2025 is close to the 32% typical for wind plants across the US.

The average electricity customer in Deaf Smith County goes 7.9 hours a year without power, the 147th most of 240 counties in Texas. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

02004006008001,00020182019202020212022202320242025GWh 526
02004006008001,0002019202120232025526

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

TX Hereford Wind (outlined) and other plants in Deaf Smith County, shaded. 34.748, -102.174.

Plant facts

Operator
Boralex US Operations LLC
Sector
IPP Non-CHP
Grid operator
ERCO
County
Deaf Smith County, TX
EIA plant ID
58773
Where Texas's power comes from → Texas power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
GEN1 Onshore Wind Turbine 200 MW 2014 –

Nearby

Other plants in Deaf Smith County

Questions

TX Hereford Wind, answered

How much power does TX Hereford Wind produce?

TX Hereford Wind has 200 MW of capacity from one generator. In 2025 it generated 526 GWh, 30% of the most it could have made running flat out all year (its capacity factor).

How many homes does TX Hereford Wind power?

Its 2025 output of 526 GWh equals the yearly electricity use of about 40,000 average Texas homes (1,110 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is TX Hereford Wind?

TX Hereford Wind is in Deaf Smith County, Texas, at about 34.748°, -102.174°. It is one of 3 power plants of 1 MW or more in the county. The average electricity customer in Deaf Smith County goes 7.9 hours a year without power, the 147th most of 240 counties in Texas. The county's page has the full outage record.

Who operates TX Hereford Wind?

It is operated by Boralex US Operations LLC (EIA sector: IPP Non-CHP), and it feeds ERCOT, the Texas grid.

When did TX Hereford Wind open?

Its oldest generator still running came online in 2014.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Texas home's 1,110 kWh a month in 2025. Methodology.