Wind power plant · Deaf Smith, TX
TX Jumbo Road Wind
TX Jumbo Road Wind is a 300 MW wind power plant in Deaf Smith County, Texas, operated by TX Jumbo Road Wind, LLC. Its oldest generator still running came online in 2015. In 2025 it generated 653 GWh, about what 49,000 average Texas homes use in a year.
TX Jumbo Road Wind in context
Among the 230 wind plants in Texas in the EIA's inventory, it is the 35th largest, about 0.7% of the state's 45 GW of wind capacity.
Deaf Smith County has 3 power plants of 1 MW or more with 710 MW in all; TX Jumbo Road Wind is 42% of that and the largest of 3 wind plants there.
Its capacity factor of 25% in 2025 is lower than the 32% typical for wind plants across the US.
The average electricity customer in Deaf Smith County goes 7.9 hours a year without power, the 147th most of 240 counties in Texas. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
TX Jumbo Road Wind (outlined) and other plants in Deaf Smith County, shaded. 34.720, -102.253.
Plant facts
- Operator
- TX Jumbo Road Wind, LLC
- Sector
- IPP Non-CHP
- Grid operator
- ERCO
- County
- Deaf Smith County, TX
- EIA plant ID
- 59621
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| JRWND | Onshore Wind Turbine | 300 MW | 2015 | – |
Nearby
Other plants in Deaf Smith County
Questions
TX Jumbo Road Wind, answered
How much power does TX Jumbo Road Wind produce?
TX Jumbo Road Wind has 300 MW of capacity from one generator. In 2025 it generated 653 GWh, 25% of the most it could have made running flat out all year (its capacity factor).
How many homes does TX Jumbo Road Wind power?
Its 2025 output of 653 GWh equals the yearly electricity use of about 49,000 average Texas homes (1,110 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is TX Jumbo Road Wind?
TX Jumbo Road Wind is in Deaf Smith County, Texas, at about 34.720°, -102.253°. It is one of 3 power plants of 1 MW or more in the county. The average electricity customer in Deaf Smith County goes 7.9 hours a year without power, the 147th most of 240 counties in Texas. The county's page has the full outage record.
Who operates TX Jumbo Road Wind?
It is operated by TX Jumbo Road Wind, LLC (EIA sector: IPP Non-CHP), and it feeds ERCOT, the Texas grid.
When did TX Jumbo Road Wind open?
Its oldest generator still running came online in 2015.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Texas home's 1,110 kWh a month in 2025. Methodology.