Wind power plant · Dukes, MA
Vineyard Wind 1
Vineyard Wind 1 is a 800 MW wind power plant in Dukes County, Massachusetts, operated by Vineyard Wind 1 LLC. Its oldest generator still running came online in 2026.
Vineyard Wind 1 in context
Among the 20 wind plants in Massachusetts in the EIA's inventory, it is the largest, about 89% of the state's 899 MW of wind capacity.
Dukes County has 4 power plants of 1 MW or more with 803 MW in all; Vineyard Wind 1 is 100% of that.
The average electricity customer in Dukes County goes 5.3 hours a year without power, the 7th most of 14 counties in Massachusetts. The county's page has the full outage record.
Where it is
Vineyard Wind 1 (outlined) and other plants in Dukes County, shaded. 41.047, -70.487.
Plant facts
- Operator
- Vineyard Wind 1 LLC
- Sector
- IPP Non-CHP
- Grid operator
- ISNE
- County
- Dukes County, MA
- EIA plant ID
- 63093
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| VW01 | Offshore Wind Turbine | 800 MW | 2026 | – |
Nearby
Other plants in Dukes County
Questions
Vineyard Wind 1, answered
How much power does Vineyard Wind 1 produce?
Vineyard Wind 1 has 800 MW of capacity from one generator. No full year of generation is reported yet.
Where is Vineyard Wind 1?
Vineyard Wind 1 is in Dukes County, Massachusetts, at about 41.047°, -70.487°. It is one of 4 power plants of 1 MW or more in the county. The average electricity customer in Dukes County goes 5.3 hours a year without power, the 7th most of 14 counties in Massachusetts. The county's page has the full outage record.
Who operates Vineyard Wind 1?
It is operated by Vineyard Wind 1 LLC (EIA sector: IPP Non-CHP), and it feeds ISO New England.
When did Vineyard Wind 1 open?
Its oldest generator still running came online in 2026.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2025–2025). Methodology.