Oil power plant · Washtenaw, MI
Warner Lambert
Warner Lambert is a 12 MW oil power plant in Washtenaw County, Michigan, operated by University of Michigan NCampus Research. Its oldest generator still running came online in 1989. In 2025 it generated 24 GWh, about what 3,200 average Michigan homes use in a year.
Warner Lambert in context
Among the 57 other-fuel plants in Michigan in the EIA's inventory, it is the 23rd largest, about 1.4% of the state's 873 MW of other-fuel capacity.
Washtenaw County has 7 power plants of 1 MW or more with 316 MW in all; Warner Lambert is 4% of that and the 3rd largest of 3 oil plants there.
Its capacity factor of 22% in 2025 is close to the 25% typical for oil plants across the US.
The average electricity customer in Washtenaw County goes 16 hours a year without power, the 32nd most of 83 counties in Michigan. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Warner Lambert (outlined) and other plants in Washtenaw County, shaded. 42.299, -83.705.
Plant facts
- Operator
- University of Michigan NCampus Research
- Sector
- Commercial CHP
- Grid operator
- MISO
- County
- Washtenaw County, MI
- EIA plant ID
- 54604
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| 5164 | Natural Gas Fired Combustion Turbine | 3.0 MW | 1989 | – |
| 085-1 | Petroleum Liquids | 2.3 MW | 2005 | – |
| 085-2 | Petroleum Liquids | 2.3 MW | 2005 | – |
| 800-1 | Petroleum Liquids | 2.3 MW | 2007 | – |
| 0550 | Petroleum Liquids | 1.5 MW | 2002 | – |
| 016E | Petroleum Liquids | 1.0 MW | 1992 | – |
Nearby
Other plants in Washtenaw County
Questions
Warner Lambert, answered
How much power does Warner Lambert produce?
Warner Lambert has 12 MW of capacity from 6 generators. In 2025 it generated 24 GWh, 22% of the most it could have made running flat out all year (its capacity factor).
How many homes does Warner Lambert power?
Its 2025 output of 24 GWh equals the yearly electricity use of about 3,200 average Michigan homes (635 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Warner Lambert?
Warner Lambert is in Washtenaw County, Michigan, at about 42.299°, -83.705°. It is one of 7 power plants of 1 MW or more in the county. The average electricity customer in Washtenaw County goes 16 hours a year without power, the 32nd most of 83 counties in Michigan. The county's page has the full outage record.
Who operates Warner Lambert?
It is operated by University of Michigan NCampus Research (EIA sector: Commercial CHP), and it feeds MISO.
When did Warner Lambert open?
Its oldest generator still running came online in 1989.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Michigan home's 635 kWh a month in 2025. Methodology.