Solar power plant · Washtenaw, MI
White Tail Solar
White Tail Solar is a 140 MW solar power plant in Washtenaw County, Michigan, operated by White Tail Solar, LLC. Its oldest generator still running came online in 2025. In 2025 it generated 12 GWh, about what 1,500 average Michigan homes use in a year.
White Tail Solar in context
Among the 79 solar plants in Michigan in the EIA's inventory, it is the 10th largest, about 4.2% of the state's 3.3 GW of solar capacity.
Washtenaw County has 7 power plants of 1 MW or more with 316 MW in all; White Tail Solar is 44% of that and the largest of 2 solar plants there.
The average electricity customer in Washtenaw County goes 16 hours a year without power, the 32nd most of 83 counties in Michigan. The county's page has the full outage record.
Seasons
Month by month, 2025
Where it is
White Tail Solar (outlined) and other plants in Washtenaw County, shaded. 42.126, -83.654.
Plant facts
- Operator
- White Tail Solar, LLC
- Sector
- IPP Non-CHP
- Grid operator
- MISO
- County
- Washtenaw County, MI
- EIA plant ID
- 67678
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| WTS | Solar Photovoltaic | 140 MW | 2025 | – |
Nearby
Other plants in Washtenaw County
Questions
White Tail Solar, answered
How much power does White Tail Solar produce?
White Tail Solar has 140 MW of capacity from one generator. In 2025 it generated 12 GWh.
How many homes does White Tail Solar power?
Its 2025 output of 12 GWh equals the yearly electricity use of about 1,500 average Michigan homes (635 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is White Tail Solar?
White Tail Solar is in Washtenaw County, Michigan, at about 42.126°, -83.654°. It is one of 7 power plants of 1 MW or more in the county. The average electricity customer in Washtenaw County goes 16 hours a year without power, the 32nd most of 83 counties in Michigan. The county's page has the full outage record.
Who operates White Tail Solar?
It is operated by White Tail Solar, LLC (EIA sector: IPP Non-CHP), and it feeds MISO.
When did White Tail Solar open?
Its oldest generator still running came online in 2025.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2025–2025). Homes equivalent uses the average Michigan home's 635 kWh a month in 2025. Methodology.