Solar power plant · Gadsden, FL
Wild Azalea Solar Energy Center
Wild Azalea Solar Energy Center is a 75 MW solar power plant in Gadsden County, Florida, operated by Florida Power & Light Co. Its oldest generator still running came online in 2023. In 2025 it generated 173 GWh, about what 13,000 average Florida homes use in a year.
Wild Azalea Solar Energy Center in context
Among the 226 solar plants in Florida in the EIA's inventory, it is the 97th largest, about 0.5% of the state's 14 GW of solar capacity.
Gadsden County has 4 power plants of 1 MW or more with 197 MW in all; Wild Azalea Solar Energy Center is 38% of that and the largest of 3 solar plants there.
Its capacity factor of 27% in 2025 is higher than the 20% typical for solar plants across the US.
The average electricity customer in Gadsden County goes 13 hours a year without power, the 27th most of 67 counties in Florida. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Wild Azalea Solar Energy Center (outlined) and other plants in Gadsden County, shaded. 30.676, -84.740.
Plant facts
- Operator
- Florida Power & Light Co
- Sector
- Electric Utility
- Grid operator
- FPL
- County
- Gadsden County, FL
- EIA plant ID
- 65430
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| 1 | Solar Photovoltaic | 75 MW | 2023 | – |
Nearby
Other plants in Gadsden County
Questions
Wild Azalea Solar Energy Center, answered
How much power does Wild Azalea Solar Energy Center produce?
Wild Azalea Solar Energy Center has 75 MW of capacity from one generator. In 2025 it generated 173 GWh, 27% of the most it could have made running flat out all year (its capacity factor).
How many homes does Wild Azalea Solar Energy Center power?
Its 2025 output of 173 GWh equals the yearly electricity use of about 13,000 average Florida homes (1,103 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Wild Azalea Solar Energy Center?
Wild Azalea Solar Energy Center is in Gadsden County, Florida, at about 30.676°, -84.740°. It is one of 4 power plants of 1 MW or more in the county. The average electricity customer in Gadsden County goes 13 hours a year without power, the 27th most of 67 counties in Florida. The county's page has the full outage record.
Who operates Wild Azalea Solar Energy Center?
It is operated by Florida Power & Light Co (EIA sector: Electric Utility), and it feeds Florida Power & Light.
When did Wild Azalea Solar Energy Center open?
Its oldest generator still running came online in 2023.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2023–2025). Homes equivalent uses the average Florida home's 1,103 kWh a month in 2025. Methodology.