Wind turbines · Utah
Wind farms in Utah
208 turbines in 8 projects, about 391 MW of capacity.
Largest
The biggest wind farms
| Project | County | Turbines | Capacity | Year |
|---|---|---|---|---|
| Milford Phase I | Beaver County | 97 | 204 MW | 2009 |
| Milford Phase II | Millard County | 68 | 102 MW | 2011 |
| Latigo | San Juan County | 27 | 62 MW | 2016 |
| Spanish Fork | Utah County | 9 | 19 MW | 2008 |
| Tooele Army Depot II | Tooele County | 1 | 2 MW | 2016 |
| Shakopee Mdewakanton Sioux | Tooele County | 1 | 2 MW | 2009 |
| Camp Williams | Utah County | 2 | 1 MW | 2005 |
| unknown Utah County | Utah County | 3 | – MW | 2015 |
Build-out
Capacity added each year
How many wind turbines are in Utah?
208 in the USGS US Wind Turbine Database (V9.1 release), in 8 projects with about 391 MW of capacity: the 29th most of any state by capacity.
What is the largest wind farm in Utah?
Milford Phase I in Beaver County, with 97 turbines and about 204 MW, online from 2009.
Which Utah county has the most wind turbines?
Beaver County, with 106 turbines.
How tall are Utah's wind turbines?
The tallest in the database reaches 138 meters to the blade tip (453 feet).
Source: US Geological Survey, Lawrence Berkeley National Laboratory and American Clean Power, US Wind Turbine Database (uswtdb_V9_1_20260928.csv), public domain. Capacity counts only turbines with a stated rating (5,056 of 77,839 nationwide have none), so totals are a floor.