Solar power plant · Andrews, TX
2W Permian Solar Project Hybrid
2W Permian Solar Project Hybrid is a 460 MW solar power plant in Andrews County, Texas, operated by 2W Permian Solar, LLC. Its oldest generator still running came online in 2021. In 2025 it generated 1.0 TWh, about what 75,000 average Texas homes use in a year.
2W Permian Solar Project Hybrid in context
Among the 250 solar plants in Texas in the EIA's inventory, it is the 14th largest, about 1.2% of the state's 37 GW of solar capacity.
Andrews County has 8 power plants of 1 MW or more with 1.3 GW in all; 2W Permian Solar Project Hybrid is 35% of that and the largest of 4 solar plants there.
Its capacity factor of 25% in 2025 is higher than the 20% typical for solar plants across the US.
The average electricity customer in Andrews County goes 3.7 hours a year without power, the 215th most of 240 counties in Texas. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
2W Permian Solar Project Hybrid (outlined) and other plants in Andrews County, shaded. 32.116, -102.528.
Plant facts
- Operator
- 2W Permian Solar, LLC
- Sector
- IPP Non-CHP
- Grid operator
- ERCO
- County
- Andrews County, TX
- EIA plant ID
- 63255
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| 2WPSO | Solar Photovoltaic | 420 MW | 2021 | – |
| 2WPBA | Batteries | 40 MW · 40 MWh | 2021 | – |
Nearby
Other plants in Andrews County
Questions
2W Permian Solar Project Hybrid, answered
How much power does 2W Permian Solar Project Hybrid produce?
2W Permian Solar Project Hybrid has 460 MW of capacity from 2 generators. In 2025 it generated 1.0 TWh, 25% of the most it could have made running flat out all year (its capacity factor).
How many homes does 2W Permian Solar Project Hybrid power?
Its 2025 output of 1.0 TWh equals the yearly electricity use of about 75,000 average Texas homes (1,110 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is 2W Permian Solar Project Hybrid?
2W Permian Solar Project Hybrid is in Andrews County, Texas, at about 32.116°, -102.528°. It is one of 8 power plants of 1 MW or more in the county. The average electricity customer in Andrews County goes 3.7 hours a year without power, the 215th most of 240 counties in Texas. The county's page has the full outage record.
Who operates 2W Permian Solar Project Hybrid?
It is operated by 2W Permian Solar, LLC (EIA sector: IPP Non-CHP), and it feeds ERCOT, the Texas grid.
When did 2W Permian Solar Project Hybrid open?
Its oldest generator still running came online in 2021.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2021–2025). Homes equivalent uses the average Texas home's 1,110 kWh a month in 2025. Methodology.