Wind power plant · Andrews, TX
Jumbo Hill Wind Project
Jumbo Hill Wind Project is a 161 MW wind power plant in Andrews County, Texas, operated by Engie North America. Its oldest generator still running came online in 2020. In 2025 it generated 599 GWh, about what 45,000 average Texas homes use in a year.
Jumbo Hill Wind Project in context
Among the 230 wind plants in Texas in the EIA's inventory, it is the 140th largest, about 0.4% of the state's 45 GW of wind capacity.
Andrews County has 8 power plants of 1 MW or more with 1.3 GW in all; Jumbo Hill Wind Project is 12% of that.
Its capacity factor of 43% in 2025 is higher than the 32% typical for wind plants across the US.
The average electricity customer in Andrews County goes 3.7 hours a year without power, the 215th most of 240 counties in Texas. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Jumbo Hill Wind Project (outlined) and other plants in Andrews County, shaded. 32.386, -102.949.
Plant facts
- Operator
- Engie North America
- Sector
- IPP Non-CHP
- Grid operator
- ERCO
- County
- Andrews County, TX
- EIA plant ID
- 62630
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| WTGS1 | Onshore Wind Turbine | 161 MW | 2020 | – |
Nearby
Other plants in Andrews County
Questions
Jumbo Hill Wind Project, answered
How much power does Jumbo Hill Wind Project produce?
Jumbo Hill Wind Project has 161 MW of capacity from one generator. In 2025 it generated 599 GWh, 43% of the most it could have made running flat out all year (its capacity factor).
How many homes does Jumbo Hill Wind Project power?
Its 2025 output of 599 GWh equals the yearly electricity use of about 45,000 average Texas homes (1,110 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Jumbo Hill Wind Project?
Jumbo Hill Wind Project is in Andrews County, Texas, at about 32.386°, -102.949°. It is one of 8 power plants of 1 MW or more in the county. The average electricity customer in Andrews County goes 3.7 hours a year without power, the 215th most of 240 counties in Texas. The county's page has the full outage record.
Who operates Jumbo Hill Wind Project?
It is operated by Engie North America (EIA sector: IPP Non-CHP), and it feeds ERCOT, the Texas grid.
When did Jumbo Hill Wind Project open?
Its oldest generator still running came online in 2020.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2020–2025). Homes equivalent uses the average Texas home's 1,110 kWh a month in 2025. Methodology.