Solar power plant · Andrews, TX

Prospero Solar II

Prospero Solar II is a 250 MW solar power plant in Andrews County, Texas, operated by Prospero Solar II, LLC (Longroad). Its oldest generator still running came online in 2021. In 2025 it generated 667 GWh, about what 50,000 average Texas homes use in a year.

Capacity250 MWNameplate, September 2026
Generated667 GWhIn 2025
Capacity factor31%Share of the most it could make, 2025
Generators1Oldest from 2021

Prospero Solar II in context

Among the 250 solar plants in Texas in the EIA's inventory, it is the 48th largest, about 0.7% of the state's 37 GW of solar capacity.

Andrews County has 8 power plants of 1 MW or more with 1.3 GW in all; Prospero Solar II is 19% of that and the 3rd largest of 4 solar plants there.

Its capacity factor of 31% in 2025 is higher than the 20% typical for solar plants across the US.

The average electricity customer in Andrews County goes 3.7 hours a year without power, the 215th most of 240 counties in Texas. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

020040060080020212022202320242025GWh 667
020040060080020212022202320242025667

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

Prospero Solar II (outlined) and other plants in Andrews County, shaded. 32.276, -102.845.

Plant facts

Operator
Prospero Solar II, LLC (Longroad)
Sector
IPP Non-CHP
Grid operator
ERCO
County
Andrews County, TX
EIA plant ID
64325
Where Texas's power comes from → Texas power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
PROSP Solar Photovoltaic 250 MW 2021 –

Nearby

Other plants in Andrews County

Questions

Prospero Solar II, answered

How much power does Prospero Solar II produce?

Prospero Solar II has 250 MW of capacity from one generator. In 2025 it generated 667 GWh, 31% of the most it could have made running flat out all year (its capacity factor).

How many homes does Prospero Solar II power?

Its 2025 output of 667 GWh equals the yearly electricity use of about 50,000 average Texas homes (1,110 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is Prospero Solar II?

Prospero Solar II is in Andrews County, Texas, at about 32.276°, -102.845°. It is one of 8 power plants of 1 MW or more in the county. The average electricity customer in Andrews County goes 3.7 hours a year without power, the 215th most of 240 counties in Texas. The county's page has the full outage record.

Who operates Prospero Solar II?

It is operated by Prospero Solar II, LLC (Longroad) (EIA sector: IPP Non-CHP), and it feeds ERCOT, the Texas grid.

When did Prospero Solar II open?

Its oldest generator still running came online in 2021.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2021–2025). Homes equivalent uses the average Texas home's 1,110 kWh a month in 2025. Methodology.