Solar power plant · Culberson, TX
AETS Old Michigan Solar LLC
AETS Old Michigan Solar LLC is a 10 MW solar power plant in Culberson County, Texas, operated by AETS OpCo Holdings LLC. Its oldest generator still running came online in 2025. In 2025 it generated 6.9 GWh, about what 518 average Texas homes use in a year.
AETS Old Michigan Solar LLC in context
Among the 250 solar plants in Texas in the EIA's inventory, it is the 198th largest, about 0.0% of the state's 37 GW of solar capacity.
Culberson County has 5 power plants of 1 MW or more with 492 MW in all; AETS Old Michigan Solar LLC is 2% of that and the 4th largest of 4 solar plants there.
The average electricity customer in Culberson County goes 38 hours a year without power, the 8th most of 240 counties in Texas. The county's page has the full outage record.
Seasons
Month by month, 2025
Where it is
AETS Old Michigan Solar LLC (outlined) and other plants in Culberson County, shaded. 31.827, -104.210.
Plant facts
- Operator
- AETS OpCo Holdings LLC
- Sector
- IPP Non-CHP
- Grid operator
- ERCO
- County
- Culberson County, TX
- EIA plant ID
- 69192
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| OLDMI | Solar Photovoltaic | 10 MW | 2025 | – |
Nearby
Other plants in Culberson County
Questions
AETS Old Michigan Solar LLC, answered
How much power does AETS Old Michigan Solar LLC produce?
AETS Old Michigan Solar LLC has 10 MW of capacity from one generator. In 2025 it generated 6.9 GWh.
How many homes does AETS Old Michigan Solar LLC power?
Its 2025 output of 6.9 GWh equals the yearly electricity use of about 518 average Texas homes (1,110 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is AETS Old Michigan Solar LLC?
AETS Old Michigan Solar LLC is in Culberson County, Texas, at about 31.827°, -104.210°. It is one of 5 power plants of 1 MW or more in the county. The average electricity customer in Culberson County goes 38 hours a year without power, the 8th most of 240 counties in Texas. The county's page has the full outage record.
Who operates AETS Old Michigan Solar LLC?
It is operated by AETS OpCo Holdings LLC (EIA sector: IPP Non-CHP), and it feeds ERCOT, the Texas grid.
When did AETS Old Michigan Solar LLC open?
Its oldest generator still running came online in 2025.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2025–2025). Homes equivalent uses the average Texas home's 1,110 kWh a month in 2025. Methodology.