Solar power plant · Culberson, TX
Aragorn Solar Project
Aragorn Solar Project is a 187 MW solar power plant in Culberson County, Texas, operated by SE Aragorn, LLC. Its oldest generator still running came online in 2021. In 2025 it generated 358 GWh, about what 27,000 average Texas homes use in a year.
Aragorn Solar Project in context
Among the 250 solar plants in Texas in the EIA's inventory, it is the 98th largest, about 0.5% of the state's 37 GW of solar capacity.
Culberson County has 5 power plants of 1 MW or more with 492 MW in all; Aragorn Solar Project is 38% of that and the 2nd largest of 4 solar plants there.
Its capacity factor of 22% in 2025 is close to the 20% typical for solar plants across the US.
The average electricity customer in Culberson County goes 38 hours a year without power, the 8th most of 240 counties in Texas. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Aragorn Solar Project (outlined) and other plants in Culberson County, shaded. 31.720, -104.442.
Plant facts
- Operator
- SE Aragorn, LLC
- Sector
- IPP Non-CHP
- Grid operator
- ERCO
- County
- Culberson County, TX
- EIA plant ID
- 63329
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| IPAGN | Solar Photovoltaic | 187 MW | 2021 | – |
Nearby
Other plants in Culberson County
Questions
Aragorn Solar Project, answered
How much power does Aragorn Solar Project produce?
Aragorn Solar Project has 187 MW of capacity from one generator. In 2025 it generated 358 GWh, 22% of the most it could have made running flat out all year (its capacity factor).
How many homes does Aragorn Solar Project power?
Its 2025 output of 358 GWh equals the yearly electricity use of about 27,000 average Texas homes (1,110 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Aragorn Solar Project?
Aragorn Solar Project is in Culberson County, Texas, at about 31.720°, -104.442°. It is one of 5 power plants of 1 MW or more in the county. The average electricity customer in Culberson County goes 38 hours a year without power, the 8th most of 240 counties in Texas. The county's page has the full outage record.
Who operates Aragorn Solar Project?
It is operated by SE Aragorn, LLC (EIA sector: IPP Non-CHP), and it feeds ERCOT, the Texas grid.
When did Aragorn Solar Project open?
Its oldest generator still running came online in 2021.