Solar power plant · Culberson, TX
Hayhurst Texas Solar
Hayhurst Texas Solar is a 25 MW solar power plant in Culberson County, Texas, operated by Hayhurst Texas Solar. Its oldest generator still running came online in 2024. In 2025 it generated 70 GWh, about what 5,300 average Texas homes use in a year.
Hayhurst Texas Solar in context
Among the 250 solar plants in Texas in the EIA's inventory, it is the 176th largest, about 0.1% of the state's 37 GW of solar capacity.
Culberson County has 5 power plants of 1 MW or more with 492 MW in all; Hayhurst Texas Solar is 5% of that and the 3rd largest of 4 solar plants there.
Its capacity factor of 32% in 2025 is higher than the 20% typical for solar plants across the US.
The average electricity customer in Culberson County goes 38 hours a year without power, the 8th most of 240 counties in Texas. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Hayhurst Texas Solar (outlined) and other plants in Culberson County, shaded. 31.816, -104.085.
Plant facts
- Operator
- Hayhurst Texas Solar
- Sector
- IPP Non-CHP
- Grid operator
- ERCO
- County
- Culberson County, TX
- EIA plant ID
- 66880
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| HHTX | Solar Photovoltaic | 25 MW | 2024 | – |
Nearby
Other plants in Culberson County
Questions
Hayhurst Texas Solar, answered
How much power does Hayhurst Texas Solar produce?
Hayhurst Texas Solar has 25 MW of capacity from one generator. In 2025 it generated 70 GWh, 32% of the most it could have made running flat out all year (its capacity factor).
How many homes does Hayhurst Texas Solar power?
Its 2025 output of 70 GWh equals the yearly electricity use of about 5,300 average Texas homes (1,110 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Hayhurst Texas Solar?
Hayhurst Texas Solar is in Culberson County, Texas, at about 31.816°, -104.085°. It is one of 5 power plants of 1 MW or more in the county. The average electricity customer in Culberson County goes 38 hours a year without power, the 8th most of 240 counties in Texas. The county's page has the full outage record.
Who operates Hayhurst Texas Solar?
It is operated by Hayhurst Texas Solar (EIA sector: IPP Non-CHP), and it feeds ERCOT, the Texas grid.
When did Hayhurst Texas Solar open?
Its oldest generator still running came online in 2024.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2023–2025). Homes equivalent uses the average Texas home's 1,110 kWh a month in 2025. Methodology.